Anti Rusty Steel Structure Workshop
Main frame:Q345, epoxy zinc rich primer 80μm or HDG
Bracing:Q235, epoxy zinc rich primer 80μm or HDG
Product Introduction
Material list for Anti Rusty Steel Structure Workshop | |
Item | Remark |
Steel Structure: LxWxH(eave)= | |
Main frame | Q345, epoxy zinc rich primer 80μm or HDG |
Bracing | Q235, epoxy zinc rich primer 80μm or HDG |
Wall and Roof System:1.5m height brick wall | |
Roof vent - warehouse | φ500mm SS201, or ventilation guerite |
External wall panel | 0.5mm thickness color bond sheet, or with glass fiber insulation, or sandwich panel core material can be EPS, PU or rock wool |
Internal wall panel - warehouse | 0.5mm thickness color bond sheet, or with glass fiber insulation, or sandwich panel core material can be EPS, PU or rock wool |
Internal wall panel - office | 50mm thickness EPS sandwich panel, optional will be PU or rock wool sandwich panel in 75mm or 100mm thickness |
Aluminum component | used to fix the internal wall panel |
Steel component | used to fix the internal wall panel |
Color bond ceiling | 0.4mm thickness color bond sheet |
Color bond flashing | 0.5mm thickness color bond sheet |
Steel door D1 | 900x2080mm or steel double door |
Color bond roller door D2 | 4500x4000mm or customized dimensions |
PVC wall curtain D3 | 4000x5000mm or customized |
Aluminum sliding windows W1 | 2000mmx1200mm or customized dimensions |
drop pipe 1 | φ110mm PVC orφ160mm PVC |

Advantages
CBC’s design and research activity applies BIM system and Autodesk Revit software. Based on relevant information and requirements of the project, we establish building model to simulate the real information about the building through digital information simulation. what’s more, we can easily present details and 3D renderings of our company’s products to all clients. Our architecture and engineer team is young, professional, efficient and ambitious, will provide you most timely, economical and trouble-less services and proposals
Cost saving
Our customized H profile structure system can save around 3-5% steel usage depending on the design.
High prefabrication can save the installation time in order to save the onsite cost.
Smart structure design can also save 5-10% steel usage while can also pass the structural calculation;
One-stop solution provider
CBC provides one-stop solution for all projects which including: project design, budgetary, fabrication, logistic service, installation guidance, after sales service…
Professional communication
All of our sales teams have architectural or engineering background; all of our engineer teams can speak English; all of our project teams are combined by at least one of each above two teams to make sure we can 100% understand the requirements and output the right designs and budgetary.
During more than 10 Years’ oversea project experiences, we found that the communication is the key of success for a construction project; it’s also the key to provide customized solutions instead of standard products.

Applications
Steel structure warehouse building;
Steel structure workshop building;
Steel structure carpark;
Steel structure apartment building;
Steel structure shopping mall;
Steel structure airport terminal;
Steel structure aircraft hangar;
Steel structure school;
Steel structure Hotel;
Steel structure office building;
Steel structure retail store;
Steel structure logistic center;
Steel structure sports facilities;
Related Projects
Project Name | SG workshop project |
Finished Time | Year 2017, Nov. |
Project Place | Clark, Manila |
Building Area | 3600 S.qm |
Project Description | Anti-Rusty Steel Structure Workshop with mezzanine, total building area 3600+ S.qm. From project confirmed till finished installation total 4 months |
Project Name | Le Tigre Warehouse |
Finished Time | Year 2017 |
Project Place | Nacala Mozambique |
Building Area | 3158 S.qm |
Project Description | In Three floors, with lift and ramp for track, heavy floor loading, wind load 275km/h, all HDG steel structure. |

Project Name | AES warehouse project |
Finished Time | Year 2013-2016 |
Project Place | POM, PNG |
Building Area | 2400 S.qm each |
Project Description | Same design in around 2400S.qm each, till now total 8 units |
Project Name | SCPA workshop |
Finished Time | Year 2016 |
Project Place | Manila Philippines |
Building Area | 2600 Sq.m |
Project Description | Design and fabrication, built in heavy corrosion area |

Project Name | SMMCI Project |
Finished Time | Year 2013 |
Project Place | South Manila, Philippines |
Building Area | 2600 S.qm warehouse plus 1700sqm office/camp facility |
Project Description | For "San Mining CONST. CORP.", use as onsite warehouse, office, camp and other facilities. Full package provided by us. |

FAQ
Q: What is the size of the folded house? What is the size of the unfolded house?
Answer: The expanded size of the small extension room is 5900 in length, 5032 in width and 2500 in height (mm). The folded size is 5900 in length, 720 in width and 2500 in height (mm). The expanded size of a 20-foot extension room is 5900 long, 6470 wide and 2540 high (mm), and the folded size is 5900 long wide 2240 high 2540 (mm). The unfolded size of the 40-foot extension room is 11,800 long, 6470 high and 2530 (mm), and the folded size is 11800 long, 2290 high and 2530 (mm).
Q: What can you do for me?
A. CBC provides one-stop building solutions for projects such as:
Steel structure warehouse;
Steel structure apartment;
Steel structure workshop;
Steel structure shopping mall;
Steel structure car-park;
Mining camp;
Construction site camp;
Temporary house;
Low-cost house;
Vocational house;
Luxury residential house;
Resort villa;
Refugee house;
Isolation room;
Tiny House Expandable Container Homes
Q: What about the installation?
A: We'll provide the detailed installation drawing, supervisor guiding installation is also available. We can do turn-key job for some kind of projects.
Q: How can you guarantee the project can be approved by local authority?
A: 1) All customized designs based on your detailed requirements;
2) All materials can meet with local standards;
3) Structure calculations provided free to help to get approval;
4) More than 10 Years’ oversea project experiences prepared us well for any questions.
Q: What’s the process to start the cooperation?
A:
To let us know your requirements or to send the designs;
Confirm our customized design for you based on above requirements;
Confirm the quotation based on our customized designs;
Arrange the down payment;
Confirm the shop drawings and make clear how we can fulfill your requirement;
Pass the inspection after around 30 days of production;
Arrange the balance payment;
Receive and study the installation instructions;
Receive the materials;
Finish the installation following our instructions and on-line engineering support;
Use our BIM system for a lifetime after sales maintenance service;
Appricate your recommendation or re-order;
Q: How do you guarantee the quality of the Anti-Rusty Steel Structure Workshop?
A: Quality is the future. Quality is the top priority.
We have a five people QC team inspecting production daily, they will follow the shop drawings strictly and check every part/project at the beginning, in the middle and for finished products.
We can also assemble some units in our factory for some special customized projects to make sure everything is good enough.

You Might Also Like
Send Inquiry











