Long Life Span Steel Structure Warehouse

Purlin:Q355B, C/Z steel section, galvanization 275g/m2
Angle brace:Q235B, L- steel
Tie bar:Q235B, round pipe
Batter brace:Q235B, round bar

Product Introduction

Main Structure of Long-Life Span Steel Structure Warehouse

Column

Q355/Q235 H- steel, Box column is also available

Rafter, Beam

Q355/Q235 H- steel

2. Hot dip galvanization

Sub Structure

Purlin

Q355B, C/Z steel section, galvanization 275g/m2

Angle brace

Angle brace

Q235B, L- steel

Tie bar

Tie bar

Q235B, round pipe

Batter brace

Batter brace

Q235B, round bar

Gutter options

Gutter options

1. Galvanized steel gutter, thickness 2.0mm/2.5mm, 3.0mm

2. Painted, Pre-finished steel gutter, thickness 0.4mm/0.5mm/0.6mm

Down spout

PVC pipe

Steel flashing and cover

Steel sheet for roof ridge cap, gable wall end cover and corner cover

Options

Roof skylight 1.8mm PVC sheet and stainless-steel ventilator

Wall System

Wall panel options

1. Insulated sandwich panel, PU, rock wool, glass fiber, EPS. Two sides is steel sheet. Thickness of roof panel 50mm/75mm/100mm,
thickness of steel sheet 0.4mm/0.5mm/0.6mm

2. Steel plate, thickness 0.4mm/0.5mm/mm

3. Brick wall (provided by client)

Door

1. Roller door for truck, size customized

2. Access door, steel door, glass door etc.

Window

PVC or Aluminum frame, Fixed, swing, sliding, louver etc, size customized

Accessories and fasteners

Anchor bolts, chemical bolts, high strength bolts, ordinary bolts, self-drilling screws, rivet etc.

Other Options

Crane 5T, 6T, 10T, 16T, 30T etc.


Hot Dip Galvanized Steel Structure Warehouse-5


Design Parameter Requests

1

Size

L x W x H(mm)

2

Load

Wind Load, Snow Load, Seismic

3

Door & Window

Size and Quantity

4

Roof Panel

Corrugated Steel Plate or Insulated Sandwich Panel

5

Wall Panel

Corrugated Steel Plate or Insulated Sandwich Panel

6

Span

Clear Span or Middle Column is Allowed

7

Others

Skylight, Mezzanine, Crane



1


Advantages


Reduce construction cost:
Since light steel structure self-weight is lower than traditional steels, plus adopting light weight roofing system, the whole construction material quantity can be saved, thus reduce the overall construction cost.


High speed of construction:
As modular house, most parts are prefabricated within factory, thus, on-site assembling and construction, reduced 20% to 40% time in construction period.


Reduce site management costs
Site management costs can be reduced by 20% to 30% which can lead to a 3 % to 4% saving in terms of overall building cost Site management costs are reduced because of the shorter construction period.


More Space, Less Material
Steel’s ability to maximize space and internal width with the thinnest shell possible. Steel beam depths are around half of timber beams, offering greater usable space, fewer materials, and lower costs. This can be particularly relevant for heavily constrained sites, where steel’s space-saving properties can be the key to overcoming spatial challenges.


Steel structure workshop

Applications


Steel structure warehouse building;

Steel structure workshop building;

Steel structure carpark;

Steel structure apartment building;

Steel structure shopping mall;

Steel structure airport terminal;

Steel structure aircraft hangar;

Steel structure school;

Steel structure Hotel;

Steel structure office building;

Steel structure retail store;

Steel structure logistic center;

Steel structure sports facilities;


Related Projects


Indonesia:

PT Merdeka accommodation camp-288 rooms with ensuite;

AMMAN accommodation camp-480 rooms with ensuite;


Chile:

FRIOSAN cold storage—1600sqm Long Life Span Steel Structure Warehouse with two floors office area, in-depended dining and access room

Reduccion casa

Casa Laguna Verde-156sqm two floors house


Austrian:

Polyfit workshop and office building—in total around 2000sqm, combine steel structure, light gauge steel frame and second-hand shipping containers;


Philippines:

SCPA workshop-3200sqm Insulated Steel Structure Warehouse

SG Eco workshop-3600sqm warehouse with two floors office in 250sqm,

Iriga Factory,

BBL Camp—24 rooms accommodation camp with public services such as dining hall, gym room;

Maria De Sio Resort-320sqm

SMMCI Camp—1300sqm office building built by flatpack container house and 2600sqm warehouse


Large Span Prefabricated Steel Structure Warehouse-2


PNG:

PNG concrete Development—13 steel structure warehouse in around 1500sqm each;


Virgin Island: 10000sqm Distribution center


Reunion Island: ARC-18/19 House Project—240sqm


Large Span Prefabricated Steel Structure Warehouse


FAQ


Q: Could you please design a new and unique prefab house for me?

A: Absolutely! We are able to provide you with not only construction scheme, but landscape design! One-stop service is our outstanding superiority with no doubt.

Q: What should I provide to build a prefab house?

A: So easy! Sketch drawing would be a better reference for us. However, you will never mind if you don't have any. Simply notify us your requirements, such as the area, usage and the stories of the house. Before long, you'll possess an amazing design.

Q: How could I ensure the cost of building a prefab house?

A: Firstly, the designing scheme should be accepted. Then, the kinds of building materials should be confirmed since different types and qualities make various prices. After that, we will send you a detailed quotation.

Q: How Long does it take to build a light steel prefab house?

A: It depends on the size of the house. Generally, one 50 square meter house five workers 1-3days finished installation, save manpower and time

Q: Is it difficult to build a prefab house?

A: Totally not, you can build the house independently according to the construction drawings as long as you know how to use an electric tool.

Q: Does this kind of house can only be used in residential buildings?

A: Absolutely not. It can be used in all kinds of buildings, such as hotel, office, school, entertainment club, light industrial workshop, etc.

Q: Is prefab house stable?

A: Set your hearts at rest! You are completely safe living in light steel prefab house even if there are hurricanes of 200km/h and 9-grade earthquake outside.

Q: what are the advantages of prefab house compared to the traditional building?

A: Better isolation of sound and heat, better fireproof and anti-seismic, Wind resistance, Time and labor saving, more usable area, Excellent termite-proof capability

Q: Does prefab house look different from the ordinary one?

A: Yes. prefab house is more beautiful and suitable for any style.

Q: How do we cooperate on certain project?

A: Firstly, please send us your project details and your requirements. Then we will design


Q: How do you guarantee the quality of the Long-Life Span Steel Structure Warehouse?

A: Quality is the future. Quality is the top priority.

We have a five people QC team inspecting production daily, they will follow the shop drawings strictly and check every part/project at the beginning, in the middle and for finished products.

We can also assemble some units in our factory for some special customized projects to make sure everything is good enough.


Large Span Prefabricated Steel Structure Warehouse-Steel structure processing flow

You Might Also Like

(0/10)

clearall