Large
video
Large

Large Span Prefabricated Steel Structure Warehouse

Main frame:Q345, epoxy zinc rich primer 80μm or HDG
Bracing:Q235, epoxy zinc rich primer 80μm or HDG
C/Z type purlin:Q345, galvanized
Steel gutter:Q235, galvanized

Product Introduction

Material list for Large Span Prefabricated Steel Structure Warehouse

Item

Remark

Steel Structure: LxWxH(eave)=

Main frame

Q345, epoxy zinc rich primer 80μm or HDG

Bracing

Q235, epoxy zinc rich primer 80μm or HDG

C/Z type purlin

Q345, galvanized

Steel gutter

Q235, galvanized

Wall and Roof System:1.5m height brick wall

Roof panel - warehouse

0.5mm thickness color bond sheet, or with glass fiber insulation, or sandwich panel core material can be EPS, PU or rock wool

Skylight sheet - warehouse

1.8mm thickness PVC

Roof panel - office

50mm thickness EPS sandwich panel, optional will be PU or rock wool sandwich panel in 75mm or 100mm thickness

Roof vent - warehouse

φ500mm SS201, or ventilation guerite

External wall panel

0.5mm thickness color bond sheet, or with glass fiber insulation, or sandwich panel core material can be EPS, PU or rock wool

Internal wall panel - warehouse

0.5mm thickness color bond sheet, or with glass fiber insulation, or sandwich panel core material can be EPS, PU or rock wool

Internal wall panel - office

50mm thickness EPS sandwich panel, optional will be PU or rock wool sandwich panel in 75mm or 100mm thickness

Aluminum component

used to fix the internal wall panel


The light weight nature of the steel structure decides that, it can have more function choices like: long span steel construction at the podium level; extreme environment building which requires wind load/snow load/seismic resistant, etc.

A complete steel structure warehouses and factories is composed of several different functional systems, mainly including: structure system(including main structure, roof and purlin system, wall and beam system),maintenance system ( including roof panel, wall panel, covering and floor deck), door and window system(including door and window), ventilating system (including clerestory system and ventilators), drainage system (including gutter, rain-spout and awning),etc.


Large Span Prefabricated Steel Structure Warehouse-3

Advantages


Reduce construction cost:
Since light steel structure self-weight is lower than traditional steels, plus adopting light weight roofing system, the whole construction material quantity can be saved, thus reduce the overall construction cost.


High speed of construction:
As modular house, most parts are prefabricated within factory, thus, on-site assembling and construction, reduced 20% to 40% time in construction period.


Less pollution for environment:
Less or no pollution to air, also less or no construction trash at all. Shorter construction period will reduce the inconvenience effect to residence people nearby.


Preciseness
CBC Steel Buildings manufactures each building kit in our own plant on custom-designed jigs accordingly to the 3D model we have built during our shop drawing stage. Which means when your building kit arrives, each piece has been precisely designed to fit together the first time. There is no on-site drilling or welding required.


Steel structure workshop

Applications


Steel structure warehouse building;

Steel structure workshop building;

Steel structure carpark;

Steel structure apartment building;

Steel structure shopping mall;

Steel structure airport terminal;

Steel structure aircraft hangar;

Steel structure school;

Steel structure Hotel;

Steel structure office building;

Steel structure retail store;

Steel structure logistic center;

Steel structure sports facilities;


Related Projects


Indonesia:

PT Merdeka accommodation camp-288 rooms with ensuite;

AMMAN accommodation camp-480 rooms with ensuite;


Chile:

FRIOSAN cold storage—1600sqm Large Span Prefabricated Steel Structure Warehouse with two floors office area, in-depended dining and access room

Reduccion casa

Casa Laguna Verde-156sqm two floors house


Project Name

SG workshop project

Finished Time

Year 2017, Nov.

Project Place

Clark, Manila

Building Area

3600 S.qm

Project Description

Heavy Floor Loading Steel Structure Workshop with mezzanine, total building area 3600+ S.qm. From project confirmed till finished installation total 4 months

Project Name

Tonga steel warehouse project

Finished Time

Year 2017

Project Place

Tonga

Building Area

3500 Sqm

Project Description

For Tonga National Power Supply Company. High standard


Large Span Prefabricated Steel Structure Warehouse-2


New Caledonia:

Alain's warehouse-five floors warehouse building with cargo lift, in total 1750sqm

Le Tigre Warehouse—three floors warehouse with ramp, total 3700sqm


Mozambique:

Nakala Resort—32 units of light gauge steel house as a beach side resort;


Reunion Island: ARC-18/19 House Project—240sqm


Large Span Prefabricated Steel Structure Warehouse


FAQ


Q. Who are you?

A. CBC is a top provider for customized building solutions based in Hangzhou city China.

Q: What can you do for me?

A. CBC provides one-stop building solutions for projects such as:

Steel structure warehouse;

Steel structure apartment;

Steel structure workshop;

Steel structure shopping mall;

Steel structure car-park;

Mining camp;

Construction site camp;

Temporary house;

Low-cost house;

Vocational house;

Luxury residential house;

Resort villa;

Refugee house;

Isolation room;

Tiny House Expandable Container Homes


Q: How can you guarantee the project can be approved by local authority?

A: 1) All customized designs based on your detailed requirements;

2) All materials can meet with local standards;

3) Structure calculations provided free to help to get approval;

4) More than 10 Years’ oversea project experiences prepared us well for any questions.


Q: Is prefab house stable?

A: Set your hearts at rest! You are completely safe living in light steel prefab house even if there are hurricanes of 200km/h and 9-grade earthquake outside.


Q: How do you guarantee the quality of the Large Span Prefabricated Steel Structure Warehouse?

A: Quality is the future. Quality is the top priority.

We have a five people QC team inspecting production daily, they will follow the shop drawings strictly and check every part/project at the beginning, in the middle and for finished products.

We can also assemble some units in our factory for some special customized projects to make sure everything is good enough.


Large Span Prefabricated Steel Structure Warehouse-Steel structure processing flow

You Might Also Like

(0/10)

clearall