Metal Building Garages Workshops
Finished Time:Year 2017, Nov.
Project Place:Clark, Manila
Building Area:3600 S.qm
Project Description:Metal Building Garages Workshops with mezzanine, total building area 3600+ S.qm. From project confirmed till finished installation total 4 months
Product Introduction
Design Parameter Requests for Metal Building Garages Workshops | ||
1 | Size | L x W x H(mm) |
2 | Load | Wind Load, Snow Load, Seismic |
3 | Door & Window | Size and Quantity |
4 | Roof Panel | Corrugated Steel Plate or Insulated Sandwich Panel |
5 | Wall Panel | Corrugated Steel Plate or Insulated Sandwich Panel |
6 | Span | Clear Span or Middle Column is Allowed |
7 | Others | Skylight, Mezzanine, Crane |
CBC’s design and research activity applies BIM system and Autodesk Revit software. Based on relevant information and requirements of the project, we establish building model to simulate the real information about the building through digital information simulation. what’s more, we can easily present details and 3D renderings of our company’s products to all clients.
Our architecture and engineer team are young, professional, efficient and ambitious, will provide you most timely, economical and trouble-less services and proposals
Item | Remark | |
A | Steel Structure: | |
Main frame | Q345, primary painting or HDG | |
C/Z type purlin | Q345, galvanized | |
Bracing | Q235, primary painting or HDG | |
steel stairs and handrail | Q235, primary painting or HDG | |
steel gutter | Q235, galvanized | |
Shot blasting | for rust cleaning | |
Painting | epoxy zinc rich primer(80um) | |
Total | ||
B | Wall and Roof System: | |
Roof panel | 50mm EPS Sandwich panel, options such as single steel sheet, steel sheet with fiber glass insulation etc. | |
Wall panel | 50mm EPS Sandwich panel, options such as single steel sheet, steel sheet with fiber glass insulation etc. | |
inside Wall panel | 50mm EPS Sandwich panel | |
Flashing board & edge cover | 0.5mm thickness color bond sheet | |
color-bond steel roller door | 4000x4000mm (auto rolling steel door) | |
double door | 1500x2100mm (auto rolling steel door) | |
windows | Alu. Frame single glass in 3~6mm | |
drop pipe | φ110mm PVC | |
Floor deck plated | 1mm Galvanized steel plated | |
Edge cover for floor plate | 2mm Self folding steel plated | |
sky light | 1.8mm thickness pvc | |
Total | ||
C | Accessories | |
Anchor bolt | M24, M30 | |
High strengthen bolt | M16/M20 ( 10.9s) | |
Common bolt | M12 (4.8s) | |
floor stud bolt | M16/M20 ( 10.9s) | |
Self-drilling screw | M5.5 | |
Glass glue | ||
Steel loading rack | for packing materials |
Advantages
Reduce construction cost:
Since light steel structure self-weight is lower than traditional steels, plus adopting light weight roofing system, the whole construction material quantity can be saved, thus reduce the overall construction cost.
Less pollution for environment:
Less or no pollution to air, also less or no construction trash at all. Shorter construction period will reduce the inconvenience effect to residence people nearby.
Multi-function buildings:
The light weight nature of the steel structure decides that, it can have more function choices like: long span steel construction at the podium level; extreme environment building which requires wind load/snow load/seismic resistant, etc.
A complete steel structure warehouses and factories is composed of several different functional systems, mainly including: structure system(including main structure, roof and purlin system, wall and beam system),maintenance system ( including roof panel, wall panel, covering and floor deck), door and window system(including door and window), ventilating system (including clerestory system and ventilators), drainage system (including gutter, rain-spout and awning), etc.
Applications
Steel structure warehouse building;
Steel structure workshop building;
Steel structure carpark;
Steel structure apartment building;
Steel structure shopping mall;
Steel structure airport terminal;
Steel structure aircraft hangar;
Steel structure school;
Steel structure Hotel;
Steel structure office building;
Steel structure retail store;
Steel structure logistic center;
Steel structure sports facilities;
Related Projects
Project Name | SG workshop project |
Finished Time | Year 2017, Nov. |
Project Place | Clark, Manila |
Building Area | 3600 S.qm |
Project Description | Metal Building Garages Workshops with mezzanine, total building area 3600+ S.qm. From project confirmed till finished installation total 4 months |
Project Name | Tonga steel warehouse project |
Finished Time | Year 2017 |
Project Place | Tonga |
Building Area | 3500 Sqm |
Project Description | For Tonga National Power Supply Company. High standard |
Project Name | AES warehouse project |
Finished Time | Year 2013-2016 |
Project Place | POM, PNG |
Building Area | 2400 S.qm each |
Project Description | Same design in around 2400S.qm each, till now total 8 units |
Project Name | Virgin Islands Logistic Center |
Finished Time | Year 2015 |
Project Place | Virgin Islands |
Building Area | 11700 S.qm |
Project Description | Partial two floors steel structure building, heavy wind loading. |
Project Name | SMMCI Project |
Finished Time | Year 2013 |
Project Place | South Manila, Philippines |
Building Area | 2600 S.qm warehouse plus 1700sqm office/camp facility |
Project Description | For "San Mining CONST. CORP.", use as onsite warehouse, office, camp and other facilities. Full package provided by us. |
FAQ
Q. Who are you?
A. CBC is a top provider for customized building solutions based in Hangzhou city China.
Q: Do you provide on-site installation service?
1) Only large projects provide installation services
2) General projects, we can provide Installation guide service based on customers’ request.
3) Installation supervision charge standard: 150USD/day, customer should responsible for the travel fee, accommodation, translation fee, and ensure staff’s health and safety.
Q: How to control the quality of your product?
a. quality of the design: think about possible problems in advance and provide a high-quality design solution.
b. quality of the raw material: choose the qualified raw material
c. quality of the production: precise manufacturing technique, experienced workers, strict quality inspection.
Q: What’s the benefits to cooperate with CBC?
A: To cooperate with CBC so that you can benefit from the professional services provided by the engineer team and commercial team:
Quick response;
Cost saving;
Free design;
Full range of options to meet with your special requirements;
One-stop solution to save your time and min. the communication troubles;
BIM system which can be relied for a lifetime period of the project;
Q: What's your supply capacity?
A: Annual production capacity details are as follows:
Container house: 7200sets
Prefab house; 564000 square meters
Steel structure: 360000 square meters.
Q: What’s the process to start the cooperation?
A: To let us know your requirements or to send the designs;
Confirm our customized design for you based on above requirements;
Confirm the quotation based on our customized designs;
Arrange the down payment;
Confirm the shop drawings and make clear how we can fulfill your requirement;
Pass the inspection after around 30 days of production;
Arrange the balance payment;
Receive and study the installation instructions;
Receive the materials;
Finish the installation following our instructions and on-line engineering support;
Use our BIM system for a lifetime after sales maintenance service;
Appricate your recommendation or re-order;
Q: How do you guarantee the quality of the Metal Building Garages Workshops?
A: Quality is the future. Quality is the top priority.
We have a five people QC team inspecting production daily, they will follow the shop drawings strictly and check every part/project at the beginning, in the middle and for finished products.
We can also assemble some units in our factory for some special customized projects to make sure everything is good enough.
You Might Also Like
Send Inquiry