Steel
video
Steel

Steel Structure Workshop Building

Main steel frame:Q345, HDG 80μm thickness
Bracing:Q235, HDG 80μm thickness
C/Z type purlin:Q345

Product Introduction

Steel Structure Workshop Building is a durable, reliable, cost-effective, sustainable option for low-rise, mid-rise, and high-rise building projects and typically refers to building steel frame systems where the vertical and horizontal structural elements are formed by a system of structural steel beams and columns.

Item

Remark

Steel Structure:

Main steel frame

Q345, HDG 80μm thickness

Bracing

Q235, HDG 80μm thickness

C/Z type purlin

Q345

steel gutter

Q345, HDG 80μm thickness

Shot blasting

for rust cleaning

Roof and wall system

wall panel

50mm Rockwool sandwich panel, steel plate T=0.6mm

Roof panel

50mm Rockwool sandwich panel, steel plate T=0.6mm

Flashing board and edge cover

0.6mm thickness color bond sheet

drop pipe 1

φ110mm PVC

W1: windows

2800*1200mm alu. Sliding window

D2: color-bond steel roller

4000*4000mm (auto rolling steel door)

Accessories

Anchor bolt

M30

High strengthen bolt

M16/M20 (10.9s)

Common bolt

M12 (4.8s)

screw

M5.5

sealant

The loading pallet

Steel frame pallet for loading 


Hot Dip Galvanized Steel Structure Warehouse-5

Advantages


Reduce construction cost:
Since light steel structure self-weight is lower than traditional steels, plus adopting light weight roofing system, the whole construction material quantity can be saved, thus reduce the overall construction cost.

High speed of construction:
As modular house, most parts are prefabricated within factory, thus, on-site assembling and construction, reduced 20% to 40% time in construction period.

Reduce site management costs:
Site management costs can be reduced by 20% to 30% which can lead to a 3 % to 4% saving in terms of overall building cost Site management costs are reduced because of the shorter construction period.


Steel structure workshop

Applications


Steel structure warehouse building;

Steel structure workshop building;

Steel structure carpark;

Steel structure apartment building;

Steel structure shopping mall;

Steel structure airport terminal;

Steel structure aircraft hangar;

Steel structure school;

Steel structure Hotel;

Steel structure office building;

Steel structure retail store;

Steel structure logistic center;

Steel structure sports facilities;


Related Projects

Project Name

Tonga steel warehouse project

Finished Time

Year 2017

Project Place

Tonga

Building Area

3500 Sqm

Project Description

For Tonga National Power Supply Company. High standard

Project Name

Le Tigre Warehouse

Finished Time

Year 2017

Project Place

Nacala Mozambique

Building Area

3158 S.qm

Project Description

In Three floors, with lift and ramp for track, heavy floor loading, wind load 275km/h, all HDG steel structure.

Project Name

Alain's warehouse

Finished Time

Year 2017

Project Place

New Caledonia

Building Area

1150 S.qm

Project Description

Five floors steel structure warehouse building with elevator, heavy wind loading.


Large Span Prefabricated Steel Structure Warehouse-2


Project Name

PNG Concrete warehouse

Finished Time

Year 2014-2020

Project Place

POM, PNG

Building Area

2700 Sq.m

Project Description

Six Miles development, total 8 units each around 2700S.qm, till now total building area 21000S.qm

Project Name

SCPA workshop

Finished Time

Year 2016

Project Place

Manila Philippines

Building Area

2600 Sq.m

Project Description

Design and fabrication, built in heavy corrosion area


Philippines:

SCPA workshop-3200sqm with Two Floor Flat Pack Container Homes inside

SG Eco workshop-3600sqm warehouse with two floors office in 250sqm,

Iriga Factory,

BBL Camp—24 rooms accommodation camp with public services such as dining hall, gym room;

Maria De Sio Resort-320sqm

SMMCI Camp—1300sqm office building built by flatpack container house and 2600sqm warehouse


1


Project Name

SMMCI Project

Finished Time

Year 2013

Project Place

South Manila, Philippines

Building Area

2600 S.qm warehouse plus 1700sqm office/camp facility

Project Description

For "San Mining CONST. CORP.", use as onsite warehouse, office, camp and other facilities. Full package provided by us.


2


FAQ


1. Do you provide on-site installation service?

1) Only large projects provide installation services

2) General projects, we can provide Installation guide service based on customers’ request.

3) Installation supervision charge standard: 150USD/day, customer should responsible for the travel fee, accommodation, translation fee, and ensure staff’s health and safety.


2.What’s your delivery time?

Salesman will confirm the time accordingly, large order should communicate with order management department in advance. Normally, delivery time is 45days after receive deposit. Large order delivery time should be arranged separately.


3.How to control the quality of your product?

a. quality of the design: think about possible problems in advance and provide a high-quality design solution.

b. quality of the raw material: choose the qualified raw material

c. quality of the production: precise manufacturing technique, experienced workers, strict quality inspection.


4. How to deal with quality problems?

Warranty is 3 years. Within the warranty period, HANGZHOU XIXI BUILDING CO., LTD will responsible for all quality problems caused by production.


5. If there is a clear service life of your products? If have, how long?

Under conventional climate and environment, steel structure whole building 10 years, main structure 15 years, protecting system 10 years.


6. What designs do you have in different climates (How can the products adopt to different climates)?

Strong wind region: improve the wind-resisting ability of the internal structure.

Cold region: increase the thickness of the wall, or use good insulation material, improve anti-pressure ability of the structure.

High corrosion region: use corrosion resistant material, or paint anticorrosive coating.


7.Q: How do you guarantee the quality of the Steel Structure Workshop Building?

A: Quality is the future. Quality is the top priority.

We have a five people QC team inspecting production daily, they will follow the shop drawings strictly and check every part/project at the beginning, in the middle and for finished products.

We can also assemble some units in our factory for some special customized projects to make sure everything is good enough.


Anti Rusty Steel Structure Workshop-Steel structure processing flow

You Might Also Like

(0/10)

clearall