Eco
video
Eco

Eco Friendly Steel Structure Workshop

Load:Wind Load, Snow Load, Seismic
Door & Window:Size and Quantity 
Roof Panel:Corrugated Steel Plate or Insulated Sandwich Panel
Wall Panel:Corrugated Steel Plate or Insulated Sandwich Panel

Product Introduction

Design Parameter Requests for Eco Friendly Steel Structure Workshop

1

Size

L x W x H(mm)

2

Load

Wind Load, Snow Load, Seismic

3

Door & Window

Size and Quantity

4

Roof Panel

Corrugated Steel Plate or Insulated Sandwich Panel

5

Wall Panel

Corrugated Steel Plate or Insulated Sandwich Panel

6

Span

Clear Span or Middle Column is Allowed

7

Others

Skylight, Mezzanine, Crane


CBC factory building structure is mainly composed of horizontal structure and vertical structure. Horizontal structure system is bent (including roof truss, beam and column) as the basic bearing structure, to bear the roof under load, horizontal wind load, earthquake action, the vertical load and horizontal level of crane load. Between the longitudinal structure system is made up of column, column support beams, walls, etc. In addition, there are houses, walls and roof support, to form a space rigid frame.


Hot Dip Galvanized Steel Structure Warehouse-5


Advantages


Size can be customized
Large span, clear span can reach to 70m without middle columns
Environment protective, no garbage caused, low demand of foundation
Doors, windows, and interior partitions can be customized and flexibly fixed
5. Beautiful appearance, different colors for the wall and roof cladding
Cost saving and convenient transportation
Fast installation and easy to maintenance
Anti-rust and normally more than 50years using lifespan, surface treatment can be paint or hot dip galvanization
Safe and stable, can resist 8 grade earthquakes
Structure can be designed according to the required live load and local snow load and wind load, can resist typhoon or hurricane


Steel structure workshop

Applications


Steel structure warehouse building;

Steel structure workshop building;

Steel structure carpark;

Steel structure apartment building;

Steel structure shopping mall;

Steel structure airport terminal;

Steel structure aircraft hangar;

Steel structure school;

Steel structure Hotel;

Steel structure office building;

Steel structure retail store;

Steel structure logistic center;

Steel structure sports facilities;


Related Projects


Indonesia:

PT Merdeka accommodation camp-288 rooms with ensuite;

AMMAN accommodation camp-480 rooms with ensuite;


Chile:

FRIOSAN cold storage—1600sqm Eco Friendly Steel Structure Workshop with two floors office area, in-depended dining and access room

Reduccion casa

Casa Laguna Verde-156sqm two floors house


Austrian:

Polyfit workshop and office building—in total around 2000sqm, combine steel structure, light gauge steel frame and second-hand shipping containers;


Philippines:

SCPA workshop-3200sqm with Two Floor Flat Pack Container Homes inside

SG Eco workshop-3600sqm warehouse with two floors office in 250sqm,

Iriga Factory,

BBL Camp—24 rooms accommodation camp with public services such as dining hall, gym room;

Maria De Sio Resort-320sqm

SMMCI Camp—1300sqm office building built by flatpack container house and 2600sqm warehouse


Large Span Prefabricated Steel Structure Warehouse-2


Project Name

AES warehouse project

Finished Time

Year 2013-2016

Project Place

POM, PNG

Building Area

2400 S.qm each

Project Description

Same design in around 2400S.qm each, till now total 8 units

Project Name

PNG Concrete warehouse

Finished Time

Year 2014-2020

Project Place

POM, PNG

Building Area

2700 Sq.m

Project Description

Six Miles development, total 8 units each around 2700S.qm, till now total building area 21000S.qm

Project Name

SCPA workshop

Finished Time

Year 2016

Project Place

Manila Philippines

Building Area

2600 Sq.m

Project Description

Design and fabrication, built in heavy corrosion area

Project Name

Virgin Islands Logistic Center

Finished Time

Year 2015

Project Place

Virgin Islands

Building Area

11700 S.qm

Project Description

Partial two floors steel structure building, heavy wind loading.


1


Project Name

SMMCI Project

Finished Time

Year 2013

Project Place

South Manila, Philippines

Building Area

2600 S.qm warehouse plus 1700sqm office/camp facility

Project Description

For "San Mining CONST. CORP.", use as onsite warehouse, office, camp and other facilities. Full package provided by us.


2


FAQ


Q: Are you a factory or a trading company?

A: Hangzhou Xixi Building Co., LTD. is a factory located in Xiaoshan District, Hangzhou, China.


Q: What's your supply capacity?

A: Annual production capacity details are as follows:
Container house: 72000sets
Prefab house; 564000 square meters
Portable toilet: 24000sets
Steel structure: 360000 square meters.


Q: How to install it?

A: We will provide detailed instructions along with video to you. Professional installation engineers team is available for foreign countries at your cost if it is necessary.


Q: How long is your delivery time?

A: It takes 2-30days according to different order Qty and requests.


Q: What’s the process to start the cooperation?

A: To let us know your requirements or to send the designs;

Confirm our customized design for you based on above requirements;

Confirm the quotation based on our customized designs;

Arrange the down payment;

Confirm the shop drawings and make clear how we can fulfill your requirement;

Pass the inspection after around 30 days of production;

Arrange the balance payment;

Receive and study the installation instructions;

Receive the materials;

Finish the installation following our instructions and on-line engineering support;

Use our BIM system for a lifetime after sales maintenance service;

Appricate your recommendation or re-order;


Q: How do you guarantee the quality of the Eco Friendly Steel Structure Workshop?

A: Quality is the future. Quality is the top priority.

We have a five people QC team inspecting production daily, they will follow the shop drawings strictly and check every part/project at the beginning, in the middle and for finished products.

We can also assemble some units in our factory for some special customized projects to make sure everything is good enough.


Anti Rusty Steel Structure Workshop-Steel structure processing flow

You Might Also Like

(0/10)

clearall