Quick
video
Quick

Quick Assemble Steel Structure Workshop

Quick Assemble Steel Structure Workshop is made by custom made H profile steel frames; The steel profiles are designed based on the loading calculation; Custom made profiles can save the steel usage and save project cost; All connections are well prefabricated in our workshop and ready to joint; We provide also envelopment system such as wall and roof panel, insulation, doors and window.

Product Introduction

Material list for Quick Assemble Steel Structure Workshop

Item

Remark

Steel Structure: LxWxH (eave)=

Bracing

Q235, epoxy zinc rich primer 80μm or HDG

Steel gutter

Q235, galvanized

Wall and Roof System:1.5m height brick wall

Skylight sheet - warehouse

1.8mm thickness PVC

Roof panel - office

50mm thickness EPS sandwich panel, optional will be PU or rock wool sandwich panel in 75mm or 100mm thickness

External wall panel

0.5mm thickness color bond sheet, or with glass fiber insulation, or sandwich panel core material can be EPS, PU or rock wool

Internal wall panel - office

50mm thickness EPS sandwich panel, optional will be PU or rock wool sandwich panel in 75mm or 100mm thickness

Aluminum component

used to fix the internal wall panel

Color bond ceiling

0.4mm thickness color bond sheet

Color bond flashing

0.5mm thickness color bond sheet

Color bond roller door D2

4500x4000mm or customized dimensions

Aluminum sliding windows W1

2000mmx1200mm or customized dimensions

Accessories:

Anchor bolt

M20, M24

High strengthen bolt

M16

Common bolt

M12 (4.8s)


Hot Dip Galvanized Steel Structure Warehouse-5


Advantages


Size can be customized
Large span, clear span can reach to 70m without middle columns
Environment protective, no garbage caused, low demand of foundation
Doors, windows, and interior partitions can be customized and flexibly fixed
Beautiful appearance, different colors for the wall and roof cladding
Cost saving and convenient transportation
Fast installation and easy to maintenance
Anti-rust and normally more than 50years using lifespan, surface treatment can be paint or hot dip galvanization
Safe and stable, can resist 8 grade earthquakes
Structure can be designed according to the required live load and local snow load and wind load, can resist typhoon or hurricane


Steel structure workshop

Process of Quick Assemble Steel Structure Workshop

We have professional welding team who are well educated and have welding certificates, most important is that most of them have many years working experiences.

All steel frames are customized in our workshop, and the process is: use flame cutting to cut the raw materials into sizes we need; assemble the steel plates into H profile; use arc welding to full weld the H profile section, make sure the strength of the steel profiles; adjust the welded steel sections, make all of them are straignt and in well shape; spot welding to assemble the connections; shotblashing to erase the rust; painting or hot dip galvanization to protect the steel frames get rusty again.

Architecture Design Steel Structure Workshop-Steel structure processing flow


Applications


Steel structure warehouse building;

Steel structure workshop building;

Steel structure carpark;

Steel structure apartment building;

Steel structure shopping mall;

Steel structure airport terminal;

Steel structure aircraft hangar;

Steel structure school;

Steel structure Hotel;

Steel structure office building;

Steel structure retail store;

Steel structure logistic center;

Steel structure sports facilities;


Related Projects


Project location: Tonga

Project time: July 2017

Category: Warehouse

Product type: Steel structure

Project scale: Total construction area 2300㎡

Project feature: large span Quick Assemble Steel Structure Workshop, heavy wind loading. With also fiber glass roof insulation. With roof skylight.


Project location: Mozambique Resort

Project time: 2013.6-2014.2

Category: Resort hotel project

Product type: Light steel building

Project scale: 49 sets, 8000㎡

Project feature: There are only a few hotels, not to mention boutique hotels in resort areas, so it is difficult to satisfy the tourists' accommodation needs. The boutique hotel project has filled up the blank of local resort hotel market.

This project was located near the beach of the Atlantic Sea, target is to provide service for European and Chinese tourists.


Large Span Prefabricated Steel Structure Warehouse-2


Project Name

PNG Concrete warehouse

Finished Time

Year 2014-2020

Project Place

POM, PNG

Building Area

2700 Sq.m

Project Description

Six Miles development, total 8 units each around 2700S.qm, till now total building area 21000S.qm

Project Name

SCPA workshop

Finished Time

Year 2016

Project Place

Manila Philippines

Building Area

2600 Sq.m

Project Description

Design and fabrication, built in heavy corrosion area


1


Project Name

SMMCI Project

Finished Time

Year 2013

Project Place

South Manila, Philippines

Building Area

2600 S.qm warehouse plus 1700sqm office/camp facility

Project Description

For "San Mining CONST. CORP.", use as onsite warehouse, office, camp and other facilities. Full package provided by us.


2


FAQ


Q: Are you a factory or a trading company?

A: Hangzhou Xixi Building Co., LTD. is a factory located in Xiaoshan District, Hangzhou, China.


Q: How to install it?

A: We will provide detailed instructions along with video to you. Professional installation engineers’ team is available for foreign countries at your cost if it is necessary.


Q: How long is your delivery time?

A: It takes 2-30days according to different order Qty and requests.


Q: What’s the process to start the cooperation?

A: To let us know your requirements or to send the designs;

Confirm our customized design for you based on above requirements;

Confirm the quotation based on our customized designs;

Arrange the down payment;

Confirm the shop drawings and make clear how we can fulfill your requirement;

Pass the inspection after around 30 days of production;

Arrange the balance payment;

Receive and study the installation instructions;

Receive the materials;

Finish the installation following our instructions and on-line engineering support;

Use our BIM system for a lifetime after sales maintenance service;

Appricate your recommendation or re-order;


Q: How do you guarantee the quality of the Quick Assemble Steel Structure Workshop?

A: Quality is the future. Quality is the top priority.

We have a five people QC team inspecting production daily, they will follow the shop drawings strictly and check every part/project at the beginning, in the middle and for finished products.

We can also assemble some units in our factory for some special customized projects to make sure everything is good enough.

You Might Also Like

(0/10)

clearall