Large Span Steel Structure Shopping Mall
video
Large Span Steel Structure Shopping Mall

Large Span Steel Structure Shopping Mall

Large Span Steel Structure Shopping Mall is mainly composed of horizontal structure and vertical structure. Horizontal structure system is bent (including roof truss, beam and column) as the basic bearing structure, to bear the roof under load, horizontal wind load, earthquake action, the vertical load and horizontal level of crane load.

Product Introduction

Large Span Steel Structure Shopping Mall is mainly composed of horizontal structure and vertical structure. Horizontal structure system is bent (including roof truss, beam and column) as the basic bearing structure, to bear the roof under load, horizontal wind load, earthquake action, the vertical load and horizontal level of crane load. Between the longitudinal structure system is made up of column, column support beams, walls, etc. In addition, there are houses, walls and roof support, to form a space rigid frame.


Item

Unit

Remark

Wall and Roof System

sky light panel

1.8mm PVC

awning Roof panel 1

0.6mm thickness color bond sheet

awning Roof panel 2

6+0.76btv+6mm Laminated tempered glass

Exterior wall panel

150mm thickness PU sandwich panel

interior wall panel

150mm thickness PU sandwich panel

steel component

2mm steel U channel

alu. Component

1mm alu.

parapet wall panel

0.6mm thickness color bond sheet

Flashing board and edge cover

0.6mm thickness color bond sheet

ceiling

12mm gypsum board

floor tile

10mm tile

drop pipe

m

φ160mm PVC

Floor deck plated

1mm Galvanized steel plated

Edg cover for floor plate

kg

2mm Self folding steel plate

RUD1: color-bond steel roller door

nos

3000*3000mm(auto rolling steel door)

D1:MDF door

nos

900*2100mm

D2:MDF door

nos

1850*2100mm

Accessories

Anchor bolt

nos

M30

High strengthens bolts

nos

M16/M20 ( 10.9s)

floor stud bolt

nos

M16

Common bolt

nos

M12 (4.8s)

Self-drilling screw

nos

M5.5

Glass glue

box

Sanitary

toilet

nos

wash basin

nos

shower head

nos

urinal

nos

kitchen cabinet

m

partition wall

plumbing

set


Hot Dip Galvanized Steel Structure Warehouse-5


Advantages


Customized designs

No project will be exactly the same. Our engineer team will provide customized designs based on your detail requirements and the local regulations.

Even if you have an original design, we will amend based on our fabrication system to save cost while to meet the local regulation;


BIM system to support life-time service

All projects will be modeling in the BIM system which will have 3D view and detail parts list including every steel member, connection part, connection bolt, brace and purling…these drawings and information can support for a life-time after sales service.


Professional communication

All of our sales teams have architectural or engineering background; all of our engineer teams can speak English; all of our project teams are combined by at least one of each above two teams to make sure we can 100% understand the requirements and output the right designs and budgetary.

During more than 10 Years’ oversea project experiences, we found that the communication is the key of success for a construction project; it’s also the key to provide customized solutions instead of standard products.


Steel structure workshop

Applications


Steel structure warehouse building;

Steel structure workshop building;

Steel structure carpark;

Steel structure apartment building;

Steel structure shopping mall;

Steel structure airport terminal;

Steel structure aircraft hangar;

Steel structure school;

Steel structure Hotel;

Steel structure office building;

Steel structure retail store;

Steel structure logistic center;

Steel structure sports facilities;


Related Projects


Large Span Prefabricated Steel Structure Warehouse-2


Indonesia:

PT Merdeka accommodation camp-288 rooms with ensuite;

AMMAN accommodation camp-480 rooms with ensuite;


Philippines:

SCPA workshop-3200sqm with Two Floor Flat Pack Container Homes inside

SG Eco workshop-3600sqm warehouse with two floors office in 250sqm,

Iriga Factory,

BBL Camp—24 rooms accommodation camp with public services such as dining hall, gym room;

Maria De Sio Resort-320sqm

SMMCI Camp—1300sqm office building built by flatpack container house and 2600sqm warehouse


2


Project Name

SMMCI Project

Finished Time

Year 2013

Project Place

South Manila, Philippines

Building Area

2600 S.qm warehouse plus 1700sqm office/camp facility

Project Description

For "San Mining CONST. CORP.", use as onsite warehouse, office, camp and other facilities. Full package provided by us.


FAQ


Q: What can you do for me?

A. CBC provides one-stop building solutions for projects such as:

Steel structure warehouse;

Steel structure apartment;

Steel structure workshop;

Steel structure shopping mall;

Steel structure car-park;

Mining camp;

Construction site camp;

Temporary house;

Low-cost house;

Vocational house;

Luxury residential house;

Resort villa;

Refugee house;

Isolation room;

Tiny House Expandable Container Homes


Q: What about the installation?

A: We'll provide the detailed installation drawing, supervisor guiding installation is also available. We can do turn-key job for some kind of projects.


Q: What’s the benefits to cooperate with CBC?

A: To cooperate with CBC so that you can benefit from the professional services provided by the engineer team and commercial team:

Quick response;

Cost saving;

Free design;

Full range of options to meet with your special requirements;

One-stop solution to save your time and min. the communication troubles;

BIM system which can be relied for a lifetime period of the project;


Q: What’s the process to start the cooperation?

A: 1-To let us know your requirements or to send the designs;

2-Confirm our customized design for you based on above requirements;

3-Confirm the quotation based on our customized designs;

4-Arrange the down payment;

5-Confirm the shop drawings and make clear how we can fulfill your requirement;

6-Pass the inspection after around 30 days of production;

7-Arrange the balance payment;

8-Receive and study the installation instructions;

9-Receive the materials;

10-Finish the installation following our instructions and on-line engineering support;

11-Use our BIM system for a lifetime after sales maintenance service;

12-Appricate your recommendation or re-order;


Q: How do you guarantee the quality of the Large Span Steel Structure Shopping Mall?
A: Quality is the future. Quality is the top priority.

We have a five people QC team inspecting production daily, they will follow the shop drawings strictly and check every part/project at the beginning, in the middle and for finished products.

We can also assemble some units in our factory for some special customized projects to make sure everything is good enough.


Anti Rusty Steel Structure Workshop-Steel structure processing flow

You Might Also Like

(0/10)

clearall