Fast Install Steel Structure Warehouse
Fast Install Steel Structure Warehouse: The maintenance system is mainly use colored steel sheets or sandwich panels. For the pressed steel floor deck system, we use glass wool as the heat insulating material. For lighting, PVC lighting boards are needed.
Product Introduction
Fast Install Steel Structure Warehouse: The maintenance system is mainly use colored steel sheets or sandwich panels. For the pressed steel floor deck system, we use glass wool as the heat insulating material. For lighting, PVC lighting boards are needed.
Item | Unit | Remark |
Steel Structure: | Main structure + mezzanine + basketball court | |
Main frame | ㎏ | Q345 |
C/Z type purlin | ㎏ | Q345, galvanized |
Bracing | ㎏ | Q235 |
steel stair and handrail | ㎏ | Q345 |
Shot blasting | ㎏ | for rust cleaning |
Painting | ㎏ | epoxy zinc rich primer painting 80μm |
Wall and Roof System | ||
basketball court Roof panel | ㎡ | 10mm PC panel |
main Roof panel | ㎡ | 0.6mm thickness color bond sheet+50mm thickness insulation glass + Aluminum foil paper + stainless steel net, white |
awning Roof panel 1 | ㎡ | 0.6mm thickness color bond sheet |
steel component | ㎏ | 2mm steel U channel |
parapet wall panel | ㎡ | 0.6mm thickness color bond sheet |
Flashing board and edge cover | ㎡ | 0.6mm thickness color bond sheet |
ceiling | ㎡ | 12mm gypsum board |
drop pipe | m | φ160mm PVC |
Floor deck plated | ㎡ | 1mm Galvanized steel plated |
Edg cover for floor plate | kg | 2mm Self folding steel plate |
RUD1: color-bond steel roller door | nos | 3000*3000mm(auto rolling steel door) |
D1:MDF door | nos | 900*2100mm |
W1: alu. Frame+12mm low-e glass + steel mesh | nos | 5000*1400mm |
W2: alu. Frame+12mm low-e glass | nos | 3200*1100mm |
curtain wall | ㎡ | Alu. Frame, 6+12A+6 glazed |

Advantages
One-stop solution provider
CBC provides one-stop solution for all projects which including: project design, budgetary, fabrication, logistic service, installation guidance, after sales service…
BIM system to support life-time service
All projects will be modeling in the BIM system which will have 3D view and detail parts list including every steel member, connection part, connection bolt, brace and purling…these drawings and information can support for a life-time after sales service.
Professional communication
All of our sales teams have architectural or engineering background; all of our engineer teams can speak English; all of our project teams are combined by at least one of each above two teams to make sure we can 100% understand the requirements and output the right designs and budgetary.
During more than 10 Years’ oversea project experiences, we found that the communication is the key of success for a construction project; it’s also the key to provide customized solutions instead of standard products.

Applications
Steel structure warehouse building;
Steel structure workshop building;
Steel structure carpark;
Steel structure apartment building;
Steel structure shopping mall;
Steel structure airport terminal;
Steel structure aircraft hangar;
Steel structure school;
Steel structure Hotel;
Steel structure office building;
Steel structure retail store;
Steel structure logistic center;
Steel structure sports facilities;
Related Projects
Project Name | SCPA workshop |
Finished Time | Year 2016 |
Project Place | Manila Philippines |
Building Area | 2600 Sq.m |
Project Description | Design and fabrication, built in heavy corrosion area |
Project Name | Virgin Islands Logistic Center |
Finished Time | Year 2015 |
Project Place | Virgin Islands |
Building Area | 11700 S.qm |
Project Description | Partial two floors steel structure building, heavy wind loading. |

| Project Name | SG workshop project | ||
| Finished Time | Year 2017, Nov. | ||
| Project Place | Clark, Manila | ||
| Building Area | 3600 S.qm | ||
| Project Description | Fast Install Steel Structure Warehouse with mezzanine, total building area 3600+ S.qm. From project confirmed till finishied installation total 4 months | ||
| Project Name | Tonga steel warehouse project | ||
| Finished Time | Year 2017 | ||
| Project Place | Tonga | ||
| Building Area | 3500 Sqm | ||
| Project Description | For Tonga National Power Supply Company. High standard | ||
| Project Name | Le Tigre Warehouse | ||
| Finished Time | Year 2017-2018 | ||
| Project Place | Nacala Mozambique | ||
| Building Area | 3158 S.qm | ||
| Project Description | In Three floors, with lift and ramp for track, heavy floor loading, wind load 275km/h, all HDG steel structure. | ||
| Project Name | Alain's warehouse | ||
| Finished Time | Year 2017-2018 | ||
| Project Place | New Caledonia | ||
| Building Area | 1150 S.qm | ||
| Project Description | Five floors steel structure warehouse building with elevator, heavy wind loading. |

Project Name | SMMCI Project |
Finished Time | Year 2013 |
Project Place | South Manila, Philippines |
Building Area | 2600 S.qm warehouse plus 1700sqm office/camp facility |
Project Description | For "San Mining CONST. CORP.", use as onsite warehouse, office, camp and other facilities. Full package provided by us. |
FAQ
1.You are factory or trading company?
We are manufacture factory. And you are welcomed to visit us at any time. The quality control flow and sales team will show our professionalism. Also, you will can get best and most competitive price after visiting us.
5. Do you offer designing service for us?
Yes, we could design full solution drawings as your requirements. By using AutoCAD, PKPM, MTS, 3D3S, Tarch, Tekla Structures
(Xsteel) and etc. we can design complex industrial building like office mansion, super marker, auto dealer shop, shipping mall, 5
star hotel.
6. What is the delivery time?
Delivery time depends on order quantities. In general, the delivery time to nearest seaport in China will be 30 days after
receiving deposit.
7. How can you get a quotation for your projects?
You can contact us by email, phone, Alibaba TM, WhatsApp, Skype, Viber and so on 24*7 and you will get reply within 8 hours.
8.How do you guarantee the quality of the Fast Install Steel Structure Warehouse?
A: Quality is the future. Quality is the top priority.
We have a five people QC team inspecting production daily, they will follow the shop drawings strictly and check every part/project at the beginning, in the middle and for finished products.
We can also assemble some units in our factory for some special customized projects to make sure everything is good enough.

You Might Also Like
Send Inquiry










