Q345
video
Q345

Q345 Cold Rolled Steel Structure Apartment

Finished Time:Year 2017
Project Place:Nacala Mozambique
Building Area:3158 S.qm
Project Description:In Three floors, with lift and ramp for track, heavy floor loading, wind load 275km/h, all HDG steel structure.

Product Introduction

CBC Q345 Cold Rolled Steel Structure Apartment is mainly composed of horizontal structure and vertical structure. Between the longitudinal structure system is made up of column, column support beams, walls, etc. In addition, there are houses, walls and roof support, to form a space rigid frame.


Item

Specifications

Main structure

Main structure frame

Q345, H profile:HN200*100*5.5*8/HW150*150*7*10/[]140*6

Roof and Wall system

Outside wall structure

12mm thickness OSB panel

150mm thickness Glass wool insulation layer

two layers of 12mm thickness OSB panel

two layers of House warp (only for the inside wall of toilet)

150mm thickness Glass wool insulation layer

Ceiling

Outside of house: 0.5mm thickness rippled colored steel sheet

Toilet room: 12mm thickness PVC ceiling panel

Floor deck

Floor deck: 1mm thickness Galvanized pressed steel plate

Edge cover sheet: 2mmt thickness galvanized steel plate

Flashing board and edge cover steel sheet

0.5mm thickness colored steel sheet

Aluminum alloy profile

Corner place to cover

Gutter

PVC gutter

Rainspout

PVC rainspout: 80x80mm with accessories

Accessories 1

Wash-basin

Ceramic, Chinese standard

Shower room

size: 900x900mm, Chinese standard

WC-Seat

Ceramic, Chinese standard

Kitchen cabinet

size: 2x0.6m, with water-faucet, water-sink, and four head-gas cooker, Chinese standard

Pipe system

for 80 toilet room and 40 kitchen, Chinese standard

Electrical system

light , switch, socket, DB, for the details pls check the drawing, Chinese standard

Gas conduit

only for the gas conduits, not included the terminal equipment, Chinese standard

Elevator

Custom made Chinese brand, for 8 person, 640kgs, Chinese standard


Hot Dip Galvanized Steel Structure Warehouse-5

Advantages

Cost-saving

It is inexpensive to manufacture and erection, it requires less maintenance than other traditional building methods. Steel frames won’t rot, splinter or become damaged by pests, and insurance companies typically charge substantially less on homeowner’s insurance for steel frames over timber frames.


High speed of construction

As modular house, most parts are prefabricated within factory, thus, on-site assembling and construction, reduced 20% to 40% time in construction period.


Reduce site management costs

Site management costs can be reduced by 20% to 30% which can lead to a 3 % to 4% saving in terms of overall building cost Site management costs are reduced because of the shorter construction period.


Recyclability

When a steel-framed building is demolished, its components can be reused or circulated into the steel industry's closed-loop recycling system for meltdown and repurposing. Steel can be recycled endlessly without loss of properties. Steel saves the usage of natural raw resources around 30%.


Multi-function buildings

The light weight nature of the steel structure decides that, it can have more function choices like: long span steel construction at the podium level; extreme environment building which requires wind load/snow load/seismic resistant, etc.

A complete steel structure warehouses and factories is composed of several different functional systems, mainly including: structure system(including main structure, roof and purlin system, wall and beam system),maintenance system ( including roof panel, wall panel, covering and floor deck), door and window system(including door and window), ventilating system (including clerestory system and ventilators), drainage system (including gutter, rain-spout and awning), etc.


Steel structure workshop

Applications


Steel structure warehouse building;

Steel structure workshop building;

Steel structure carpark;

Steel structure apartment building;

Steel structure shopping mall;

Steel structure airport terminal;

Steel structure aircraft hangar;

Steel structure school;

Steel structure Hotel;

Steel structure office building;

Steel structure retail store;

Steel structure logistic center;

Steel structure sports facilities;


Related Projects


Indonesia:

PT Merdeka accommodation camp-288 rooms with ensuite;

AMMAN accommodation camp-480 rooms with ensuite;


Austrian:

Polyfit workshop and office building—in total around 2000sqm, combine steel structure, light gauge steel frame and second-hand shipping containers;


Large Span Prefabricated Steel Structure Warehouse-2


Project Name

Le Tigre Warehouse

Finished Time

Year 2017

Project Place

Nacala Mozambique

Building Area

3158 S.qm

Project Description

In Three floors, with lift and ramp for track, heavy floor loading, wind load 275km/h, all HDG steel structure.

Project Name

Alain's warehouse

Finished Time

Year 2017

Project Place

New Caledonia

Building Area

1150 S.qm

Project Description

Five floors steel structure warehouse building with elevator, heavy wind loading.


Mozambique:

Nakala Resort—32 units of light gauge steel house as a beach side resort;


Tonga: Tonga Power Plant—3600sqm


Reunion Island: ARC-18/19 House Project—240sqm


1

Project Name

PNG Concrete warehouse

Finished Time

Year 2014-2020

Project Place

POM, PNG

Building Area

2700 Sq.m

Project Description

Six Miles development, total 8 units each around 2700S.qm, till now total building area 21000S.qm

Project Name

SCPA workshop

Finished Time

Year 2016

Project Place

Manila Philippines

Building Area

2600 Sq.m

Project Description

Design and fabrication, built in heavy corrosion area


2


FAQ


Q: You are factory or trading company?

We are manufacture factory. And you are welcomed to visit us at any time. The quality control flow and sales team will show our professionalism. Also, you will can get best and most competitive price after visiting us.


Q: Is your price competitive compared with other companies?

Our business objectives are to give the best price with same quality and best quality with the same price. We will do everything we can to reduce your cost and guarantee you get the best product that you paid for.


Q: What's your supply capacity?

A: Annual production capacity details are as follows:
Container house: 7200sets
Prefab house; 564000 square meters
Steel structure: 360000 square meters.


Q: How do you guarantee the quality of the Q345 Cold Rolled Steel Structure Apartment?

A: Quality is the future. Quality is the top priority.

We have a five people QC team inspecting production daily, they will follow the shop drawings strictly and check every part/project at the beginning, in the middle and for finished products.

We can also assemble some units in our factory for some special customized projects to make sure everything is good enough.


Anti Rusty Steel Structure Workshop-Steel structure processing flow

Next: No Information

You Might Also Like

(0/10)

clearall