Heavy Floor Loading Steel Structure Apartment
Size:L x W x H(mm)
Load:Wind Load, Snow Load, Seismic
Door & Window:Size and Quantity
Roof Panel:Corrugated Steel Plate or Insulated Sandwich Panel
Product Introduction
Design Parameter Requests for Modern Design Steel Structure Apartment | ||
1 | Size | L x W x H(mm) |
2 | Load | Wind Load, Snow Load, Seismic |
3 | Door & Window | Size and Quantity |
4 | Roof Panel | Corrugated Steel Plate or Insulated Sandwich Panel |
5 | Wall Panel | Corrugated Steel Plate or Insulated Sandwich Panel |
6 | Span | Clear Span or Middle Column is Allowed |
7 | Others | Skylight, Mezzanine, Crane |
CBC provides single-story steel structure building and multi-story steel structure building.
Steel structure building is made of heavy steel frame and cladding panels, doors and windows etc. Main Column and rafter are welded H -steel, purlin is steel with galvanization 275g/m2, can be C or Z section. Secondary steel components are L- steel, CHS, SHS, RHS, round steel rod, etc. Most of the steel components are connected by bolts.
Options: one floor or multi-floor, crane, skylight, ventilation etc.
Items | Remark |
The cost for Main material: | |
Main structure frame | Q345B |
C--type purlin | (Q345 Galvanized: 275g/m2) |
Gutter | (Q235 Galvanized: 275g/m2) |
Supporting system and other steels | Q235 |
Shot blasting | for rust cleaning |
Painting | epoxy zinc rich primer painting (100um thickness) |
Cost for Roof & Protecting system: | |
Roof panel | 50mm thickness, corrugated PU sandwich panel, the exterior side color bond steel sheet is: 0.42mm thickness, the interior side color bond steel sheet is: 0.35mm thickness, the PU density is: 40kg/m3 |
Roof skylight panel | 1.8mm thickness PVC material |
Outside wall panel | 50mm thickness, PU sandwich panel, both two sides color bond steel sheet are: 0.42mm thickness, the PU density is: 40kg/m3 |
Flashing board, edge wrapping cover steel sheet | 0.5mm thickness, colored steel sheet |
Window | Aluminum alloy sliding window with single glass:13000*1200mm |
Door | Electrical roller up shutter door, size: 8000*5000mm |

Advantages
Customized designs
No project will be exactly the same. Our engineer team will provide customized designs based on your detail requirements and the local regulations.
Even if you have an original design, we will amend based on our fabrication system to save cost while to meet the local regulation;
Faster Assembly
It comes pre-engineered, which means that your employees will spend less time measuring, cutting and shaping. with a corresponding 20% to 40% reduction in construction time. This prefab steel building makes construction easier, faster, and provides cost savings on labor.
One-stop solution provider
CBC provides one-stop solution for all projects which including: project design, budgetary, fabrication, logistic service, installation guidance, after sales service…
BIM system to support life-time service
All projects will be modeling in the BIM system which will have 3D view and detail parts list including every steel member, connection part, connection bolt, brace and purling…these drawings and information can support for a life-time after sales service.
Professional communication
All of our sales teams have architectural or engineering background; all of our engineer teams can speak English; all of our project teams are combined by at least one of each above two teams to make sure we can 100% understand the requirements and output the right designs and budgetary.
During more than 10 Years’ oversea project experiences, we found that the communication is the key of success for a construction project; it’s also the key to provide customized solutions instead of standard products.

Applications
Steel structure warehouse building;
Steel structure workshop building;
Steel structure carpark;
Steel structure apartment building;
Steel structure shopping mall;
Steel structure airport terminal;
Steel structure aircraft hangar;
Steel structure school;
Steel structure Hotel;
Steel structure office building;
Steel structure retail store;
Steel structure logistic center;
Steel structure sports facilities;
Related Projects
Indonesia:
PT Merdeka accommodation camp-288 rooms with ensuite;
AMMAN accommodation camp-480 rooms with ensuite;
Project Name | PNG Concrete warehouse |
Finished Time | Year 2014-2020 |
Project Place | POM, PNG |
Building Area | 2700 Sq.m |
Project Description | Six Miles development, total 8 units each around 2700S.qm, till now total building area 21000S.qm |
Project Name | SCPA workshop |
Finished Time | Year 2016 |
Project Place | Manila Philippines |
Building Area | 2600 Sq.m |
Project Description | Design and fabrication, built in heavy corrosion area |
Philippines:
SCPA workshop-3200sqm with Two Floor Flat Pack Container Homes inside
SG Eco workshop-3600sqm warehouse with two floors office in 250sqm,
Iriga Factory,
BBL Camp—24 rooms accommodation camp with public services such as dining hall, gym room;
Maria De Sio Resort-320sqm
SMMCI Camp—1300sqm office building built by flatpack container house and 2600sqm warehouse

Project Name | AES warehouse project |
Finished Time | Year 2013-2016 |
Project Place | POM, PNG |
Building Area | 2400 S.qm each |
Project Description | Same design in around 2400S.qm each, till now total 8 units |
Project Name | Virgin Islands Logistic Center |
Finished Time | Year 2015 |
Project Place | Virgin Islands |
Building Area | 11700 S.qm |
Project Description | Partial two floors steel structure building, heavy wind loading. |

Project Name | SMMCI Project |
Finished Time | Year 2013 |
Project Place | South Manila, Philippines |
Building Area | 2600 S.qm warehouse plus 1700sqm office/camp facility |
Project Description | For "San Mining CONST. CORP.", use as onsite warehouse, office, camp and other facilities. Full package provided by us. |

FAQ
1. Do you provide on-site installation service?
1) Only large projects provide installation services
2) General projects, we can provide Installation guide service based on customers’ request.
3) Installation supervision charge standard: 150USD/day, customer should responsible for the travel fee, accommodation, translation fee, and ensure staff’s health and safety.
2.What’s your delivery time?
Salesman will confirm the time accordingly, large order should communicate with order management department in advance. Normally, delivery time is 45days after receive deposit. Large order delivery time should be arranged separately.
3.How to control the quality of your product?
a. quality of the design: think about possible problems in advance and provide a high-quality design solution.
b. quality of the raw material: choose the qualified raw material
c. quality of the production: precise manufacturing technique, experienced workers, strict quality inspection.
4. How to deal with quality problems?
Warranty is 3 years. Within the warranty period, HANGZHOU XIXI BUILDING CO., LTD will responsible for all quality problems caused by production.
5. If there is a clear service life of your products? If have, how long?
Under conventional climate and environment, steel structure whole building 10 years, main structure 15 years, protecting system 10 years.
6. What designs do you have in different climates (How can the products adopt to different climates)?
Strong wind region: improve the wind-resisting ability of the internal structure.
Cold region: increase the thickness of the wall, or use good insulation material, improve anti-pressure ability of the structure.
High corrosion region: use corrosion resistant material, or paint anticorrosive coating.
Q: What’s the benefits to cooperate with CBC?
A: To cooperate with CBC so that you can benefit from the professional services provided by the engineer team and commercial team:
Quick response;
Cost saving;
Free design;
Full range of options to meet with your special requirements;
One-stop solution to save your time and min. the communication troubles;
BIM system which can be relied for a lifetime period of the project;
Q: What's your supply capacity?
A: Annual production capacity details are as follows:
Container house: 7200sets
Prefab house; 564000 square meters
Steel structure: 360000 square meters.
Q: How do you guarantee the quality of the Heavy Floor Loading Steel Structure Apartment?
A: Quality is the future. Quality is the top priority.
We have a five people QC team inspecting production daily, they will follow the shop drawings strictly and check every part/project at the beginning, in the middle and for finished products.
We can also assemble some units in our factory for some special customized projects to make sure everything is good enough.

You Might Also Like
Send Inquiry










