Modern Design Steel Structure Apartment
Size:L x W x H(mm)
Load:Wind Load, Snow Load, Seismic
Door & Window:Size and Quantity
Roof Panel:Corrugated Steel Plate or Insulated Sandwich Panel
Product Introduction
Design Parameter Requests for Modern Design Steel Structure Apartment | ||
1 | Size | L x W x H(mm) |
2 | Load | Wind Load, Snow Load, Seismic |
3 | Door & Window | Size and Quantity |
4 | Roof Panel | Corrugated Steel Plate or Insulated Sandwich Panel |
5 | Wall Panel | Corrugated Steel Plate or Insulated Sandwich Panel |
6 | Span | Clear Span or Middle Column is Allowed |
7 | Others | Skylight, Mezzanine, Crane |
CBC can perfectly combine the traditional steel structure building with light steel building, this combination can be used as multi-story hotel, department, office building etc., This kind of building has many advantages, such as large span, Low demand of base structure, seismic and wind resistance, fast to build and easy to maintain and so on. It can be built on many special places such as mountain, beaches and land with bad condition.
We can also prefabricate the wall system and roof system for our clients so that it will shorten the construction period. The steel structure can be packed in one package, and it is easy to upload, download and stack in the site
Item | Specifications |
Roof and Wall system | |
Roof panel structure | cancel |
50mm thickness EPS sandwich panel, both two sides' steel sheet is 0.42mm thickness, EPS density:10kg/m3 | |
0.75mm thickness, 70C-type light steel keel, Q550 (Galvanized)-CC70-0.75-11-41 | |
27mm thickness mantellic embossed composite PU sandwich panel | |
Inside wall structure | 2*9mm plaster board, with putty and painting, should painted on site |
12mm thickness Cement-fiber panel (only for the interior side of inside wall panel of toilet) | |
two layers of House warp (only for the inside wall of toilet) | |
150mm thickness Glass wool insulation layer | |
0.75mm thickness, 140C-type light steel keel, Q550 (Galvanized) | |
The inside wall for Separating wall and stairwell | 2*9mm plaster board, with putty and painting, should painted on site |
12mm thickness Cement-fiber panel (only for the interior side of inside wall panel of toilet) | |
two layers of 12mm thickness OSB panel | |
two layers of House warp (only for the inside wall of toilet) | |
150mm thickness Glass wool insulation layer | |
0.75mm thickness, 140C-type light steel keel, Q550 (Galvanized) | |
The ceramic tile for inside wall of toilet | Abatis for the ceramic tile inside wall of toilet |
300*450mm ceramic tile | |
The water-proof famishment for the toilet floor | |
The water-proof famishment for the toilet inside wall (0.3m height) | |
Door | Double-open steel security door: 2000*2000mm |
PVC mound pressing door: 860*2050mm | |
600*1800mm MDF door | |
PVC mound pressing door: 600*1800mm | |
Aluminum alloy sliding glass door: 700*2100mm | |
Rainspout | PVC rainspout: 80x80mm with accessories |
Accessories 2 | |
Hardware fitting for light steel keel | |
steel structure frame: Foundation bolts | M24 |
steel structure frame: High-strength bolts | M20/M16 ( 10.9s) |
steel structure frame: Floor deck bolt | M16*120 |
steel structure frame: Self-drilling screws | |
Glass glue | |
Integrated loading rack-light weight | Each one welded by the H-Beam and each one weight is: 700kgs |
Integrated loading rack-H profile | |

Advantages
Reduce construction cost:
Since light steel structure self-weight is lower than traditional steels, plus adopting light weight roofing system, the whole construction material quantity can be saved, thus reduce the overall construction cost.
High speed of construction:
As modular house, most parts are prefabricated within factory, thus, on-site assembling and construction, reduced 20% to 40% time in construction period.
Reduce site management costs:
Site management costs can be reduced by 20% to 30% which can lead to a 3 % to 4% saving in terms of overall building cost Site management costs are reduced because of the shorter construction period.
Less pollution for environment:
Less or no pollution to air, also less or no construction trash at all. Shorter construction period will reduce the inconvenience effect to residence people nearby.

Applications
Steel structure warehouse building;
Steel structure workshop building;
Steel structure carpark;
Steel structure apartment building;
Steel structure shopping mall;
Steel structure airport terminal;
Steel structure aircraft hangar;
Steel structure school;
Steel structure Hotel;
Steel structure office building;
Steel structure retail store;
Steel structure logistic center;
Steel structure sports facilities;
Related Projects
Project Name | SG workshop project |
Finished Time | Year 2017, Nov. |
Project Place | Clark, Manila |
Building Area | 3600 S.qm |
Project Description | Modern Design Steel Structure Apartment with mezzanine, total building area 3600+ S.qm. From project confirmed till finished installation total 4 months |
Project Name | Le Tigre Warehouse |
Finished Time | Year 2017 |
Project Place | Nacala Mozambique |
Building Area | 3158 S.qm |
Project Description | In Three floors, with lift and ramp for track, heavy floor loading, wind load 275km/h, all HDG steel structure. |

Project Name | PNG Concrete warehouse |
Finished Time | Year 2014-2020 |
Project Place | POM, PNG |
Building Area | 2700 Sq.m |
Project Description | Six Miles development, total 8 units each around 2700S.qm, till now total building area 21000S.qm |
Project Name | SK Chile Camp |
Finished Time | Year 2014. |
Project Place | Chile |
Building Area | 256 units |
Project Description | Custom made camp designs for SK in Chile, used as office, accommodation and public areas, including walkway and part roofs. Chile standard electrical system |

Project Name | Camp In Lao |
Finished Time | Year 2016 |
Project Place | Lao |
Building Area | 120 units |
Project Description | Standard 20ft container in two floors for accommodation. Some with bathroom, also include some public shower and toilet. Provided the whole package including staircase and roof system. |
Project Name | Venezuela Housing |
Finished Time | Year 2013 |
Project Place | Venezuela |
Building Area | 560 units |
Project Description | Container house for low-cost housing project in Venezuela. |

FAQ
What’s the benefits to cooperate with CBC?
A: To cooperate with CBC so that you can benefit from the professional services provided by the engineer team and commercial team:
Quick response;
Cost saving;
Free design;
Full range of options to meet with your special requirements;
One-stop solution to save your time and min. the communication troubles;
BIM system which can be relied for a lifetime period of the project;
How to control the quality of your product?
a. quality of the design: think about possible problems in advance and provide a high-quality design solution.
b. quality of the raw material: choose the qualified raw material
c. quality of the production: precise manufacturing technique, experienced workers, strict quality inspection.
How to deal with quality problems?
Warranty is 3 years. Within the warranty period, HANGZHOU XIXI BUILDING CO., LTD will responsible for all quality problems caused by production.
If there is a clear service life of your products? If have, how long?
Under conventional climate and environment, steel structure whole building 10 years, main structure 15 years, protecting system 10 years.
How do you guarantee the quality of the Modern Design Steel Structure Apartment?
A: Quality is the future. Quality is the top priority.
We have a five people QC team inspecting production daily, they will follow the shop drawings strictly and check every part/project at the beginning, in the middle and for finished products.
We can also assemble some units in our factory for some special customized projects to make sure everything is good enough.

You Might Also Like
Send Inquiry










