Heavy Snow Loading Steel Structure Warehouse
Finished Time:Year 2013
Project Place:South Manila, Philippines
Building Area:2600 S.qm warehouse plus 1700sqm office/camp facility
Project Description:For "San Mining CONST. CORP.", use as onsite warehouse, office, camp and other facilities. Full package provided by us.
Product Introduction
Heavy Snow Loading Steel Structure Warehouse is mainly composed of horizontal structure and vertical structure. Horizontal structure system is bent (including roof truss, beam and column) as the basic bearing structure, to bear the roof under load, horizontal wind load, earthquake action, the vertical load and horizontal level of crane load. Between the longitudinal structure system is made up of column, column support beams, walls, etc. In addition, there are houses, walls and roof support, to form a space rigid frame.
Item | Unit | Material | Remarks |
Main structure cost | |||
Light gauge steel | ㎏ | G550 AZ150 | |
Steel column and beam | ㎏ | Q235 | |
Wall and roof system | |||
Roof system | ㎡ | 0.5mm colored steel glazed tile | |
㎡ | 100mm fiber glass | ||
Exterior wall | ㎡ | 27mm metal carved board | |
㎡ | House wrap | ||
㎡ | 150mmfiber glass | ||
㎡ | 12mm gypsum board | ||
㎡ | 12mm cement fiber board | ||
Interior wall | ㎡ | 12mm gypsum board | |
㎡ | 12mm cement fiber board | ||
㎡ | House wrap | ||
㎡ | 100mm fiber glass | ||
Wall (toilet) | ㎡ | wall tiles | 300*450mm ceramic for wall |
OSB board | ㎡ | 12mm OSB board | for staircase wall |
Partition panel (toilet) | ㎡ | Partition panel (toilet) | 12mm |
Floor | ㎡ | Floor-1 | 12mm composite floor board (except toilet and balcony) |
㎡ | Floor-2 | 300*300mm ceramic for outdoor balcony & toilet | |
m | Skirting line | 1.2mm PVC | |
Ceiling | ㎡ | Eaves ceiling | 0.5mm small ripple color bond steel |
㎡ | Indoor ceiling | Color steel (for outdoor balcony & toilet only) | |
㎡ | Indoor ceiling | 9mm plaster board | |
Floor deck and stair case | ㎡ | floor slab | 18mm OSB board |
㎡ | 100mm glass wool | 100mm glass fiber | |
㎡ | Tread + skirtboard | 18mm OSB board | |
m | stair railing + corridors rail | PVC | |
Window | pc | W-1 | 2400*1200mm alu. frame single glass sliding window |
pc | W-2 | 1800*1200mm alu. frame single glass sliding window | |
pc | W-3 | 900*900mm alu. frame single frosted-glass sliding window | |
pc | W-4 | 1200*1200mm alu. frame single glass sliding window | |
Door | pc | D-1 | 1000*2050mm density board door |
pc | D-2 | 900*2050mm density board door | |
Flashing | ㎡ | Flashing cover | |
Verge board | m | Verge board | |
Alu. Profile | kg | Aluminum fittings | |

Advantages
Customization
Our motto is to provide “Customized Building Solutions”.
So, if you’re not sure which size would be best for your space, we’d be glad to help you find a steel structure building that suits the dimensions of your property.
You can choose a color for your metal building from a wide range of options, including cream, brown, green, blue, gray, and black, etc.
CBC offers a wide range of building options for buyers to choose from, including roof, siding, framing, insulation, crane, ventilator, inside office or mezzanine solutions and so on.
Durability
Steel structure building can withstand extreme forces and harsh weather conditions, such as strong winds, earthquakes, hurricanes, and heavy snow. They are also unreceptive to rust and, unlike wood frames, they are not affected by termites, bugs, mildew, mold, or fungi.
Preciseness
CBC Steel Buildings manufactures each building kit in our own plant on custom-designed jigs accordingly to the 3D model we have built during our shop drawing stage. Which means when your building kit arrives, each piece has been precisely designed to fit together the first time. There is no on-site drilling or welding required.
Creativity
Steel offers architects more design freedom in color, texture, and shape than other materials. Its combination of strength, durability, beauty, precision, and malleability gives architects broader parameters to explore ideas and develop fresh solutions.
Recyclability
When a steel-framed building is demolished, its components can be reused or circulated into the steel industry's closed-loop recycling system for meltdown and repurposing. Steel can be recycled endlessly without loss of properties. Steel saves the usage of natural raw resources around 30%.
More Space, Less Material
Steel’s ability to maximize space and internal width with the thinnest shell possible. Steel beam depths are around half of timber beams, offering greater usable space, fewer materials, and lower costs. This can be particularly relevant for heavily constrained sites, where steel’s space-saving properties can be the key to overcoming spatial challenges.
Cost-saving
It is inexpensive to manufacture and erection, it requires less maintenance than other traditional building methods. Steel frames won’t rot, splinter or become damaged by pests, and insurance companies typically charge substantially less on homeowner’s insurance for steel frames over timber frames.
Faster Assembly
It comes pre-engineered, which means that your employees will spend less time measuring, cutting and shaping. with a corresponding 20% to 40% reduction in construction time. This prefab steel building makes construction easier, faster, and provides cost savings on labor.

Applications
Steel structure warehouse building;
Steel structure workshop building;
Steel structure carpark;
Steel structure apartment building;
Steel structure shopping mall;
Steel structure airport terminal;
Steel structure aircraft hangar;
Steel structure school;
Steel structure Hotel;
Steel structure office building;
Steel structure retail store;
Steel structure logistic center;
Steel structure sports facilities;
Related Projects
Project Name | SG workshop project |
Finished Time | Year 2017, Nov. |
Project Place | Clark, Manila |
Building Area | 3600 S.qm |
Project Description | Heavy Snow Loading Steel Structure Warehouse with mezzanine, total building area 3600+ S.qm. From project confirmed till finished installation total 4 months |
Project Name | Tonga steel warehouse project |
Finished Time | Year 2017 |
Project Place | Tonga |
Building Area | 3500 Sqm |
Project Description | For Tonga National Power Supply Company. High standard |
Project Name | Le Tigre Warehouse |
Finished Time | Year 2017 |
Project Place | Nacala Mozambique |
Building Area | 3158 S.qm |
Project Description | In Three floors, with lift and ramp for track, heavy floor loading, wind load 275km/h, all HDG steel structure. |
Project Name | Alain's warehouse |
Finished Time | Year 2017 |
Project Place | New Caledonia |
Building Area | 1150 S.qm |
Project Description | Five floors Heavy Snow Loading Steel Structure Warehouse with elevator, heavy wind loading. |

Project Name | AES warehouse project |
Finished Time | Year 2013-2016 |
Project Place | POM, PNG |
Building Area | 2400 S.qm each |
Project Description | Same design in around 2400S.qm each, till now total 8 units |
Project Name | PNG Concrete warehouse |
Finished Time | Year 2014-2020 |
Project Place | POM, PNG |
Building Area | 2700 Sq.m |
Project Description | Six Miles development, total 8 units each around 2700S.qm, till now total building area 21000S.qm |
Project Name | SCPA workshop |
Finished Time | Year 2016 |
Project Place | Manila Philippines |
Building Area | 2600 Sq.m |
Project Description | Design and fabrication, built in heavy corrosion area |
Project Name | Virgin Islands Logistic Center |
Finished Time | Year 2015 |
Project Place | Virgin Islands |
Building Area | 11700 S.qm |
Project Description | Partial two floors steel structure building, heavy wind loading. |

Project Name | SMMCI Project |
Finished Time | Year 2013 |
Project Place | South Manila, Philippines |
Building Area | 2600 S.qm warehouse plus 1700sqm office/camp facility |
Project Description | For "San Mining CONST. CORP.", use as onsite warehouse, office, camp and other facilities. Full package provided by us. |
FAQ
How much does it cost to build a metal building or shed?
Depending on the size, material requirements and the design. Normally it will be around USD50~150 per sqm.
We will save you 10~25% because of our professional design and abundant oversea project experiences.
What are Pre-engineered metal buildings?
A pre-engineered building is a building which is factory-built to be shipped and can be bolted together. These steel-frame buildings consist of a structural system made from rigid frames covered with sheets of metal to form the roof and walls.
Do you provide on-site installation service?
1) Only provide installation services for some large projects;
2) Generally, we can provide Installation guide service based on customers ‘request.
3) Installation supervision charge standard: customer should responsible for the travel fee, accommodation, translation fee, and ensure staff’s health and safety.
What’s your delivery time?
Normally, delivery time is 30~45 days after received the deposit.
If there is a clear service life of your products? how long?
Under conventional climate and environment, the service life of main structure is 30 years
How can the products adopt to different climates?
Strong wind region: improve the wind-resisting ability of the internal structure.
Cold region: increase the thickness of the wall, or use good insulation material, improve anti-pressure ability of the structure.
High corrosion region: use corrosion resistant material, or paint anticorrosive coating.
So, it is very important to communicate well before the design so we can offer you the best solution.
Q: How do you guarantee the quality of the Heavy Snow Loading Steel Structure Warehouse?
A: Quality is the future. Quality is the top priority.
We have a five people QC team inspecting production daily, they will follow the shop drawings strictly and check every part/project at the beginning, in the middle and for finished products.
We can also assemble some units in our factory for some special customized projects to make sure everything is good enough.

You Might Also Like
Send Inquiry










