Heavy
video
Heavy

Heavy Wind Loading Steel Structure Warehouse

Heavy Wind Loading Steel Structure Warehouse can withstand extreme forces or harsh weather conditions, such as strong winds, earthquakes, hurricanes, and heavy snow. They are also unreceptive to rust and, unlike wood frames, they are not affected by termites, bugs, mildew, mold, or fungi.

Product Introduction

Material list of Heavy Wind Loading Steel Structure Warehouse


Main frame

Q345, epoxy zinc rich primer 80μm or HDG

Bracing

Q235, epoxy zinc rich primer 80μm or HDG

C/Z type purlin

Q345, galvanized

Steel gutter

Q235, galvanized

Steel pallet

For packing

Design Parameter Requests

1

Size

L x W x H(mm)

2

Load 

Wind Load, Snow Load, Seismic

3

Door&Window

 Size   and Quantity 

4

Roof Panel

Corrugated   Steel Plate or Insulated Sandwich Panel

5

Wall Panel

Corrugated Steel Plate or   Insulated Sandwich Panel

6

Span

Clear Span or Middle   Column is Allowed

7

Others

Skylight, Mezzanine, Crane


Large Span Prefabricated Steel Structure Warehouse-3

Advantages


High speed of construction

As modular house, most parts are prefabricated within factory, thus, on-site assembling and construction, reduced 20% to 40% time in construction period.


Durability

Insulated Steel Structure Warehouse can withstand extreme forces or harsh weather conditions, such as strong winds, earthquakes, hurricanes, and heavy snow. They are also unreceptive to rust and, unlike wood frames, they are not affected by termites, bugs, mildew, mold, or fungi.


BIM system to support life-time service

All projects will be modeling in the BIM system which will have 3D view and detail parts list including every steel member, connection part, connection bolt, brace and purling…these drawings and information can support for a life-time after sales service.


Recyclability

When a steel-framed building is demolished, its components can be reused or circulated into the steel industry's closed-loop recycling system for meltdown and repurposing. Steel can be recycled endlessly without loss of properties. Steel saves on the use of natural raw resources since around 30% of today’s new steel is already being made from recycled steel.


Steel structure workshop

Applications


Steel structure warehouse building;

Steel structure workshop building;

Steel structure carpark;

Steel structure apartment building;

Steel structure shopping mall;

Steel structure airport terminal;

Steel structure aircraft hangar;

Steel structure school;

Steel structure Hotel;

Steel structure office building;

Steel structure retail store;

Steel structure logistic center;

Steel structure sports facilities;


Related Projects


Project Name

PNG Concrete Heavy Wind Loading Steel Structure Warehouse

Finished Time

Year 2014-2020

Project Place

POM, PNG

Building Area

2700 Sq.m

Project Description

Six Miles development, total 8 units each around 2700S.qm, till now total building area 21000S.qm

Project Name

SCPA workshop

Finished Time

Year 2016

Project Place

Manila Philippines

Building Area

2600 Sq.m

Project Description

Design and fabrication, built in heavy corrosion area

.

Austrian:

Polyfit workshop and office building—in total around 2000sqm, combine steel structure, light gauge steel frame and second-hand shipping containers;


Philippines:

SCPA workshop-3200sqm Insulated Steel Structure Warehouse

SG Eco workshop-3600sqm warehouse with two floors office in 250sqm,

Iriga Factory,

BBL Camp—24 rooms accommodation camp with public services such as dining hall, gym room;

Maria De Sio Resort-320sqm

SMMCI Camp—1300sqm office building built by flatpack container house and 2600sqm warehouse


Large Span Prefabricated Steel Structure Warehouse-2


PNG:

PNG concrete Development—13 steel structure warehouse in around 1500sqm each;


Virgin Island: 10000sqm Distribution center


Large Span Prefabricated Steel Structure Warehouse


FAQ


Q: What about the installation?

A: We'll provide the detailed installation drawing, supervisor guiding installation is also available. We can do turn-key job for some kind of projects.


Q: How can you guarantee the Heavy Wind Loading Steel Structure Warehouse project can be approved by local authority?

A: 1) All customized designs based on your detailed requirements;

2) All materials can meet with local standards;

3) Structure calculations provided free to help to get approval;

4) More than 10 Years’ oversea project experiences prepared us well for any questions.


Q: What’s the process to start the cooperation?

A: To let us know your requirements or to send the designs;

Confirm our customized design for you based on above requirements;

Confirm the quotation based on our customized designs;

Arrange the down payment;

Confirm the shop drawings and make clear how we can fulfill your requirement;

Pass the inspection after around 30 days of production;

Arrange the balance payment;

Receive and study the installation instructions;

Receive the materials;

Finish the installation following our instructions and on-line engineering support;

Use our BIM system for a lifetime after sales maintenance service;

Appricate your recommendation or re-order;


5. If there is a clear service life of your products? If have, how long?

Under conventional climate and environment, steel structure whole building 10 years, main structure 15 years, protecting system 10 years.


6. What designs do you have in different climates (How can the products adopt to different climates)?

Strong wind region: improve the wind-resisting ability of the internal structure.

Cold region: increase the thickness of the wall, or use good insulation material, improve anti-pressure ability of the structure.

High corrosion region: use corrosion resistant material, or paint anticorrosive coating.


Large Span Prefabricated Steel Structure Warehouse-Steel structure processing flow

You Might Also Like

(0/10)

clearall