Multiple Floors Steel Structure Apartment
video
Multiple Floors Steel Structure Apartment

Multiple Floors Steel Structure Apartment

A Fast Install Steel Structure Apartment is factory-built to be shipped to the site and bolted together. These steel-frame buildings consist of a structural system made from rigid frames covered with sheets of metal to form the roof and walls.

Product Introduction

A Multiple Floors Steel Structure Apartment is factory-built to be shipped to the site and bolted together. These steel-frame buildings consist of a structural system made from rigid frames covered with sheets of metal to form the roof and walls.

 

Hot Dip Galvanized Steel Structure Warehouse-5

Advantages

 

One-stop solution provider

CBC provides one-stop solution for all projects which including: project design, budgetary, fabrication, logistic service, installation guidance, after sales service…

 

BIM system to support life-time service

All projects will be modeling in the BIM system which will have 3D view and detail parts list including every steel member, connection part, connection bolt, brace and purling…these drawings and information can support for a life-time after sales service.

 

Professional communication

All of our sales teams have architectural or engineering background; all of our engineer teams can speak English; all of our project teams are combined by at least one of each above two teams to make sure we can 100% understand the requirements and output the right designs and budgetary.

During more than 10 Years’ oversea project experiences, we found that the communication is the key of success for a construction project; it’s also the key to provide customized solutions instead of standard products.

 

Faster Assembly
It comes pre-engineered, which means that your employees will spend less time measuring, cutting and shaping. with a corresponding 20% to 40% reduction in construction time. This Multiple Floors Steel Structure Apartment makes construction easier, faster, and provides cost savings on labor.

 

 

Steel structure workshop

 

Related Projects

 

 

1

 

Project Name

PNG Concrete warehouse

Finished Time

Year 2014-2020

Project Place

POM, PNG

Building Area

2700 Sq.m

Project Description

Six Miles development, total 8 units each around 2700S.qm, till now total building area 21000S.qm

Project Name

SCPA workshop

Finished Time

Year 2016

Project Place

Manila Philippines

Building Area

2600 Sq.m

Project Description

Design and fabrication, built in heavy corrosion area

 

2

 

You Might Also Like

(0/10)

clearall