Low Set Light Gauge Steel Prefab House
All the fixed holes and pipe holes are pre-punched, 2-3 workers can finish the installation. (Save 70% labor cost, shorten 10% construction period, fasten 30% the construction process)
Product Introduction
Main Frame for Low Set Light Gauge Steel Prefab House | ||
Light steel keel frame | kg | G550 Al-Zn Galvanized, AZ150 |
Light steel keel frame | kg | Q345 galvanized |
Light steel keel frame | kg | G550 Al-Zn Galvanized, AZ150, BlueScope brand |
Steel structure | kg | Q235,HDG |
Maintenance system | ||
Roof System | ㎡ | 0.5mm Color Steel Glazed Tile+30mm XPS Insulation Strip + Wooden batten + Roof Moisture-proof House wrap +12mm OSB board +150mm Glass Fiber insulation(Glass Fiber Owens Corning) |
㎡ | ||
m | ||
㎡ | ||
㎡ | ||
㎡ | ||
External Wall System | ㎡ | 12mm Eterpan planks+30mmXPS Insulation Strip + Wooden batten + 12mm OSB Board +Roof Moisture-proof Housewrap+12mm Jason Plaster Board(Use Single-layer 12mm Fiber Cement Board instead of 12mm Plaster Board for the Inner Side of Outer Walls in Toilet) +12mm OSB board(Just for Kitchen Wall) |
㎡ | ||
m | ||
㎡ | ||
㎡ | ||
㎡ | ||
㎡ | ||
㎡ | ||
Internal Wall System | ㎡ | 12mm Jason Plaster Board+100mm Glass Fiber insulation(Owens Corning)+12mm Jason Plaster Board(Single-layer Fiber Cement Board instead of Plaster Board for the Walls in Toilet) |
㎡ | ||
㎡ | ||
Wall Ceramic Tiles for Toilet Room | ㎡ | 300*450mm Wall Tile |
Floor Board | ㎡ | 600*600mm (Ceramic, excluding toilet) |
㎡ | 300*300mm (Ceramic, just including toilet & bathroom) | |
㎡ | Ceramic tile skirting line | |
Floor deck + stairs | ㎡ | 3m thickness, 1m width |
㎡ | 18mm Fiber Cement Board | |
㎡ | 100mm Glass Fiber insulation | |
㎡ | 12mm OSB board | |
㎡ | 300*300mm ceramic tile (Anti-skid) | |
Ceiling | ㎡ | 6mm Fiber Cement board |
㎡ | 9mm Jason Plaster Board Ceiling(Including Primary & Secondary Keel) | |
Window (AU, UL or EU standard) | Aluminum Alloy Frame Double Glass Window, comply with AS2047 standards, Glass complies with AS/NZS2208, AS1288. | |
㎡ | ALU. Sliding window | |
Door | pc | W920*H2340mm ALU. swing door |
pc | W820*H2340mm MDF door | |
pc | W820*H2340mm MDF sliding door | |
Flashing & Edge Trimming Fittings | ㎡ | Self-bending Color Steel Sheet (Roof Ridge, Gable Wall Wrapping Cover) |
Color Steel Fascia | m | Color Steel Verge Board (With Brackets) |
Aluminum Alloy Profiles | kg | Edge Covering For Corners, Door & Windows, Inside Corners. |
12mm Fiber Cement Board | ㎡ | outdoor decoration |

Advantages
Easy to install:
All the fixed holes and pipe holes are pre-punched, 2-3 workers can finish the installation. (Save 70% labor cost, shorten 10% construction period, fasten 30% the construction process)
Fire and insect resistance:
All the keels are galvanized, no need to use pesticide, preservative or glue. The wall system is filled with mineral wool and the steel frame system is fireproof.
Prefabricated:
Our factory will first manufacture all the keels, then prefabricate the walls and then pack them.
Heat insulation:
The steel wall system is not affected by the temperature or humidity so that the more heat and air conditioner energy remained in the house, thus more energy will be saved. (100 mm in thickness can match 1 m thickness of brick wall, 2-5 time better than traditional structure)
Wind & seismic resistance:
The solid connection and the hardness of the steel itself can be applied against seismic and hurricane condition. (The primary structure can resistant 230km/h wind and above 8 grade earthquake) Steel’s high strength makes it the best building material to resist the seismic force.
Artistic and comfortable:
The interior decoration is per your wish. And the air quality is good.
Energy conservation and environment protection:
Only 1% construction wastes. The recycling rates of the steel reaches to 70%. until the house life is over, the steel can still be used.
Lifetime for structure:
Lifetime of Modular Light Gauge Steel Prefab House is more than 70 years.
Fire resistance:
All the materials used can be fire resistance.
Snow resistance:
Max. 2.9KN/m2as required
High acoustic insulation:
60db of exterior wall 40db of interior wall
Packing and delivery:
600SQM/ 40'HQ container for structure only and 200SQM/ 40'HQ container for structure with decorative materials.

Applications
Light steel living house;
Light steel apartment building;
Light steel affordable house;
Light steel luxury villa;
Light steel structure restaurant;
Light steel frame office building
Light steel frame hotel building;
Light steel frame school building;
Light steel structure hospital building;
Light steel structure vocational resort house;
Light steel prefab granny flat;
Light steel frame modular pod;
Other prefab light weight house;
Related Projects
| Project Name | Damien's house | ||
| Finished Time | Year 2017, Oct. | ||
| Project Place | Coron Philippines | ||
| Building Area | 280 sq.m | ||
| Project Description | Two floors Low Set Light Gauge Steel Prefab House, basement used as a small workshop for Damien to repair the Speedboat. This house is inside the BBL resort. | ||
| Project Name | Raul's Appartment | ||
| Finished Time | Year 2019, Nov. | ||
| Project Place | Coron Philippines | ||
| Building Area | 430 sq.m | ||
| Project Description | Design and provide all materials, provide installation instructions and online support, also have good construction partner there to handle the whole project very well. |
| Project Name | Number 1 Homes House project | ||
| Finished Time | Year 2015, June | ||
| Project Place | Christchurch NZ | ||
| Building Area | 245 S.qm | ||
| Project Description | We design and provide one stop solution for this house including custom made sanitary, kitchen. All meet with AU standards. Refer to: https://www.facebook.com/number1homes/ | ||
| Project Name | BBL Accommodation Project | ||
| Finished Time | Year 2017 | ||
| Project Place | Coron Philippines | ||
| Building Area | 785 S.qm | ||
| Project Description | One and two floor buildings for accommodation and public service for BBL resort. | ||
| Project Name | Villa Dehaumont in Renuion | ||
| Finished Time | Year 2017-2018 | ||
| Project Place | Renuion Island | ||
| Building Area | 147 Sqm Three houses | ||
| Project Description | Heavy wind loading and large span. We pre-assembled all steel frames for easy installation. |
FAQ
Q. Who are you?
A. CBC is a top provider for customized building solutions based in Hangzhou city China.
Q: What can you do for me?
A. CBC provides one-stop building solutions for projects such as:
Steel structure warehouse;
Steel structure apartment;
Steel structure workshop;
Steel structure shopping mall;
Steel structure car-park;
Mining camp;
Construction site camp;
Temporary house;
Low-cost house;
Vocational house;
Luxury residential house;
Resort villa;
Refugee house;
Isolation room;
Tiny House Expandable Container Homes
Q: What's your supply capacity?
A: Annual production capacity details are as follows:
Container house: 7200sets
Prefab house; 564000 square meters
Steel structure: 360000 square meters.
Q: How can you guarantee the project can be approved by local authority?
A: 1) All customized designs based on your detailed requirements;
2) All materials can meet with local standards;
3) Structure calculations provided free to help to get approval;
4) More than 10 Years’ oversea project experiences prepared us well for any questions.
Q: What’s the process to start the cooperation?
A:
To let us know your requirements or to send the designs;
Confirm our customized design for you based on above requirements;
Confirm the quotation based on our customized designs;
Arrange the down payment;
Confirm the shop drawings and make clear how we can fulfill your requirement;
Pass the inspection after around 30 days of production;
Arrange the balance payment;
Receive and study the installation instructions;
Receive the materials;
Finish the installation following our instructions and on-line engineering support;
Use our BIM system for a lifetime after sales maintenance service;
Appricate your recommendation or re-order;
Q: How do you guarantee the quality of the Low Set Light Gauge Steel Prefab House?
A: Quality is the future. Quality is the top priority.
We have a five people QC team inspecting production daily, they will follow the shop drawings strictly and check every part/project at the beginning, in the middle and for finished products.
We can also assemble some units in our factory for some special customized projects to make sure everything is good enough.

You Might Also Like
Send Inquiry











