Heavy Floor Loading Steel Prefab House
video
Heavy Floor Loading Steel Prefab House

Heavy Floor Loading Steel Prefab House

Project location: Philippines
Project time: Nov. 2017
Category: Residential community
Product type: LGS house
Project scale: 10 sets

Product Introduction

Materials for Heavy Floor Loading Steel Prefab House

Light steel keel frame

kg

G550 Al-Zn Galvanized, AZ150

Steel structure

kg

Q235,HDG

Maintenance system

Roof System

㎡

0.5mm Color Steel Glazed Tile+30mm XPS Insulation Strip + Wooden batten + Roof Moisture-proof House wrap +12mm OSB board +150mm Glass Fiber insulation(Glass Fiber Owens Corning)

㎡

m

㎡

㎡

㎡

External Wall System

㎡

12mm Eterpan planks+30mmXPS Insulation Strip + Wooden batten + 12mm OSB Board +Roof Moisture-proof Housewrap+12mm Jason Plaster Board(Use Single-layer 12mm Fiber Cement Board instead of 12mm Plaster Board for the Inner Side of Outer Walls in Toilet) +12mm OSB board(Just for Kitchen Wall)

㎡

m

㎡

㎡

㎡

㎡

㎡

Internal Wall System

㎡

12mm Jason Plaster Board+100mm Glass Fiber insulation(Owens Corning)+12mm Jason Plaster Board(Single-layer Fiber Cement Board instead of Plaster Board for the Walls in Toilet)

㎡

㎡


light gauge steel villa-3


Advantages


Fire and insect resistance-----All the keels are galvanized, no need to use pesticide, preservative or glue. The wall system is filled with mineral wool and the steel frame system is fireproof.


Artistic and comfortable-----the interior decoration is per your wish. And the air quality is good.


Snow resistance: max. 2.9KN/m2as required


Modular Light Gauge Steel Prefab House--system instruction


Applications


Light steel living house;

Light steel apartment building;

Light steel affordable house;

Light steel luxury villa;

Light steel structure restaurant;

Light steel frame office building

Light steel frame hotel building;

Light steel frame school building;

Light steel structure hospital building;

Light steel structure vocational resort house;

Light steel prefab granny flat;

Light steel frame modular pod;

Other prefab light weight house;


Related Projects


Project Name

Raul's Apartment

Finished Time

Year 2019, Nov.

Project Place

Coron Philippines

Building Area

430 sq.m

Project Description

Design and provide all materials, provide installation instructions and online support, also have good construction partner there to handle the whole project very well.

Project Name

Youhan's office

Finished Time

Year 2020, March

Project Place

Manila

Building Area

300 sq.m

Project Description

Design and provide all materials, provide installation instructions and online support, used for sales office and a small warehouse.

Project Name

Buzz Restaurant

Finished Time

Year 2019, July

Project Place

Coron Philippines

Building Area

360 sq.m

Project Description

Design and provide all materials, provide installation instructions and online support, help the owner to build this restaurant within 4 months.


Modular Light Gauge Steel Prefab House

Project NameChile Heavy Floor Loading Steel Prefab House Project
Finished TimeYear 2017-2018
Project PlaceSouth Chile
Building Area1138 Sq.m
Project DescriptionTen units each two floors, five connected in   one row, very good design and excellent insulation for local cold weather.
Project NameMoti Resorts Project
Finished TimeYear 2013 July
Project PlaceNacala Mozambique
Building Area3793 S.qm with 48 resorts
Project DescriptionTwo bedroom resorts in Nacala near the sea   beach, one stop solution including installation.
Project NamePerth Project
Finished TimeYear 2016
Project PlacePerth AU
Building Area308 S.qm
Project DescriptionDesign and fabrication, one stop solution   including all AU standard ficilities.


1


Project location: Philippines

Project time: Nov. 2017

Category: Residential community

Product type: LGS house

Project scale: 10 sets

Project feature: This is a project for local resort owner BBL, as accommodation and other public service houses for the whole resort.


FAQ


Q: What designs do you have in different climates (How can the products adopt to different climates)?

Strong wind region: improve the wind-resisting ability of the internal structure.

Cold region: increase the thickness of the wall, or use good insulation material, improve anti-pressure ability of the structure.

High corrosion region: use corrosion resistant material, or paint anticorrosive coating.


Q: What’s the process to start the cooperation?

A: To let us know your requirements or to send the designs;

Confirm our customized design for you based on above requirements;

Confirm the quotation based on our customized designs;

Arrange the down payment;

Confirm the shop drawings and make clear how we can fulfill your requirement;

Pass the inspection after around 30 days of production;

Arrange the balance payment;

Receive and study the installation instructions;

Receive the materials;

Finish the installation following our instructions and on-line engineering support;

Use our BIM system for a lifetime after sales maintenance service;

Appricate your recommendation or re-order;


Q: How do you guarantee the quality of the Heavy Floor Loading Steel Prefab House?

A: Quality is the future. Quality is the top priority.

We have a five people QC team inspecting production daily, they will follow the shop drawings strictly and check every part/project at the beginning, in the middle and for finished products.

We can also assemble some units in our factory for some special customized projects to make sure everything is good enough.


light steel villa introduction-QC

You Might Also Like

(0/10)

clearall