Modern Design Steel Structure School
Finished Time:Year 2013
Project Place:South Manila, Philippines
Building Area:2600 S.qm warehouse plus 1700sqm office/camp facility
Project Description:For "San Mining CONST. CORP.", use as onsite warehouse, office, camp and other facilities. Full package provided by us.
Product Introduction
Hangzhou Xixi Building CO., LTD(brand name is “CBC”) is a customized building solutions provider from China, based in Hangzhou since 2017, but our main staff have at least more than 10 Years working experiences in this industry and always being focused in oversea market. We are one of the pioneers to provider flatpack container house and light gauge steel villa in China since Year 2007. Since then, we created a unique flatpack roof system to use injected PU foam as core material, which solved the problem of balance between the tightness, the strength and the full prefabrication in factory. We are also the first one to use FrameCAD system to design and manufacture the light gauge steel villa in China, and now the new building solution is widely used and accepted by builders in AU, NZ, Chile, Philippine, PNG etc..
|
Item name |
Remark |
|
Modern Design Steel Structure School size: WXBXH=(40X102X12.3) |
|
|
Main steel frame |
Q345, HDG 80μm |
|
C/Z type purlin |
Q345, galvanized |
|
Bracing |
Q235, HDG 80μm |
|
steel gutter |
Q235, HDG 80μm |
|
Shot blasting |
for rust cleaning |
|
Painting |
HDG 80μm |
|
Total |
|
|
Wall and Roof System: |
|
|
roof panel |
0.7mm color bond sheet, options: sandwich panel and glass wool insulation |
|
wall panel |
0.7mm color bond sheet, options: sandwich panel and glass wool insulation |
|
color bond flashing |
0.7mm color bond sheet |
|
steel mesh on wall |
HDG steel wire |
|
drop pipe |
φ160mm PVC |
|
Total |
|
|
Accessories: |
|
|
Anchor bolt |
M24 |
|
Anchor bolt |
M30 |
|
High strengthen bolt |
M16/M20 ( 10.9s) |
|
Common bolt |
M12 (4.8s) |
|
screw |
M5.5 |
|
Steel loading rack |
for packing materials |
Advantages
Multi-function buildings:
The light weight nature of the steel structure decides that, it can have more function choices like: long span steel construction at the podium level; extreme environment building which requires wind load/snow load/seismic resistant, etc.
A complete steel structure warehouses and factories is composed of several different functional systems, mainly including: structure system(including main structure, roof and purlin system, wall and beam system),maintenance system ( including roof panel, wall panel, covering and floor deck), door and window system(including door and window), ventilating system (including clerestory system and ventilators), drainage system (including gutter, rain-spout and awning), etc.
Creativity
Steel offers architects more design freedom in color, texture, and shape than other materials. Its combination of strength, durability, beauty, precision, and malleability gives architects broader parameters to explore ideas and develop fresh solutions.
Recyclability
When a steel-framed building is demolished, its components can be reused or circulated into the steel industry's closed-loop recycling system for meltdown and repurposing. Steel can be recycled endlessly without loss of properties. Steel saves the usage of natural raw resources around 30%.
More Space, Less Material
Steel’s ability to maximize space and internal width with the thinnest shell possible. Steel beam depths are around half of timber beams, offering greater usable space, fewer materials, and lower costs. This can be particularly relevant for heavily constrained sites, where steel’s space-saving properties can be the key to overcoming spatial challenges.
Cost-saving
It is inexpensive to manufacture and erection, it requires less maintenance than other traditional building methods. Steel frames won’t rot, splinter or become damaged by pests, and insurance companies typically charge substantially less on homeowner’s insurance for steel frames over timber frames.
Applications
Steel structure warehouse building;
Steel structure workshop building;
Steel structure carpark;
Steel structure apartment building;
Steel structure shopping mall;
Steel structure airport terminal;
Steel structure aircraft hangar;
Steel structure school;
Steel structure Hotel;
Steel structure office building;
Steel structure retail store;
Steel structure logistic center;
Steel structure sports facilities;
Related Projects
|
Project Name |
Damien's house |
|
Finished Time |
Year 2017, Oct. |
|
Project Place |
Coron Philippines |
|
Building Area |
280 sq.m |
|
Project Description |
Two floors living house, basement used as a small workshop for Damien to repair the Speedboat. This house is inside the BBL resort. |
|
Project Name |
Raul's Apartment |
|
Finished Time |
Year 2019, Nov. |
|
Project Place |
Coron Philippines |
|
Building Area |
430 sq.m |
|
Project Description |
Design and provide all materials, provide installation instructions and online support, also have good construction partner there to handle the whole project very well. |
|
Project Name |
Buzz Restaurant |
|
Finished Time |
Year 2019, July |
|
Project Place |
Coron Philippines |
|
Building Area |
360 sq.m |
|
Project Description |
Design and provide all materials, provide installation instructions and online support, help the owner to build this restaurant within 4 months. |
|
Project Name |
PNG Concrete warehouse |
|
Finished Time |
Year 2014-2020 |
|
Project Place |
POM, PNG |
|
Building Area |
2700 Sq.m |
|
Project Description |
Six Miles development, total 8 units each around 2700S.qm, till now total building area 21000S.qm |
|
Project Name |
SCPA workshop |
|
Finished Time |
Year 2016 |
|
Project Place |
Manila Philippines |
|
Building Area |
2600 Sq.m |
|
Project Description |
Design and fabrication, built in heavy corrosion area |
|
Project Name |
Virgin Islands Logistic Center |
|
Finished Time |
Year 2015 |
|
Project Place |
Virgin Islands |
|
Building Area |
11700 S.qm |
|
Project Description |
Partial two floors steel structure building, heavy wind loading. |

|
Project Name |
SMMCI Project |
|
Finished Time |
Year 2013 |
|
Project Place |
South Manila, Philippines |
|
Building Area |
2600 S.qm warehouse plus 1700sqm office/camp facility |
|
Project Description |
For "San Mining CONST. CORP.", use as onsite warehouse, office, camp and other facilities. Full package provided by us. |
FAQ
Q: Do you provide on-site installation service?
1) Only large projects provide installation services
2) General projects, we can provide Installation guide service based on customers’ request.
3) Installation supervision charge standard: 150USD/day, customer should responsible for the travel fee, accommodation, translation fee, and ensure staff’s health and safety.
Q: What’s the benefits to cooperate with CBC?
A: To cooperate with CBC so that you can benefit from the professional services provided by the engineer team and commercial team:
Quick response;
Cost saving;
Free design;
Full range of options to meet with your special requirements;
One-stop solution to save your time and min. the communication troubles;
BIM system which can be relied for a lifetime period of the project;
Q: What’s the process to start the cooperation?
A:
To let us know your requirements or to send the designs;
Confirm our customized design for you based on above requirements;
Confirm the quotation based on our customized designs;
Arrange the down payment;
Confirm the shop drawings and make clear how we can fulfill your requirement;
Pass the inspection after around 30 days of production;
Arrange the balance payment;
Receive and study the installation instructions;
Receive the materials;
Finish the installation following our instructions and on-line engineering support;
Use our BIM system for a lifetime after sales maintenance service;
Appricate your recommendation or re-order;
Q: How do you guarantee the quality of the Modern Design Steel Structure School?
A: Quality is the future. Quality is the top priority.
We have a five people QC team inspecting production daily, they will follow the shop drawings strictly and check every part/project at the beginning, in the middle and for finished products.
We can also assemble some units in our factory for some special customized projects to make sure everything is good enough.
You Might Also Like
Send Inquiry











