Eco Friendly Detachable Container House
video
Eco Friendly Detachable Container House

Eco Friendly Detachable Container House

1) 20ft: 6000*2438*2596mm
2) Or customized size
3) Roof Type: Flat roof with injected PU insulation
4) SOC pakcing for easy handling

Product Introduction

Eco Friendly Detachable Container House Material List

A: Standard unit materials

2.435W*6L*2.791H flatpack container block

Each unit including: 1: Chassis ( steel structure+18mm fiber-cement board +1.8mm PVC floor sheet) 2: Roof structure (steel structure+0.4mm color-bond steel roof sheet+100mm glass wool insulation+0.4mm color-bond steel ceiling sheet) 3: Column 4: electrical system (lamp, switch, socket, cable, DB)

wall panel

75mm EPS sandwich panel, both sides are 0.4mm thickness color bond sheets

steel door D1

steel frame: 860x2080mm

sandwich panel door D2

steel frame: 700x2000mm

aluminum sliding window W1

Alu frame+5mm single glazed: 800x1100mm

aluminum sliding window W2

Alu frame+5mm single glazed: 800x400mm

exhaust fan

PVC frame 

PVC trim plate

skirting, corner and ceiling

united materials between containers

include bolt, flashing, floor plate and article rubber

color bond flashing

0.5~0.5mm color bond steel plate 


Design Parameters

Design parameter

1) Life span: up to 20years

2) Floor Live load: 2.0KN/m2

3) Roof Live load: 0.5KN/m2

4) Wind load: 0.6KN/m2

5) Earthquake-resistance: Grade 8, Fire-proof: Grade 4

product details--Shipping Container House


Advantages

Flexiable design

Eco Friendly Detachable Container House is flexiable for space design. we have standard 6*2.4m, 6*3m, 9*3m or any other dimensions you need.

We can also combine different detachable container house into large space for some commerical or public projects such as school, office, showroom...


Termite and Insect resistant

Prefab container house floor uses 1.8mm PVC floor +18mm cement fiber board. Wall Panel uses 75mm EPS sandwich panel, material option is PU, rock wool. Colored steel sheet is 0.40m. Panel's outside is color-optional with ribs, inside is milky white. The steel sheet surface is Aluminum Zinc galvanized 50g/m2+ PE baking finish 15/5um.

There is no surface for termites to eat. Also, due to the solid construction of the container, the only openings for pests of any kind to enter the container is through any openings cut into the container for doors and windows. All of these openings are insulated and caulked/silicone to prevent weather and insects or rodents from entering. You can put one of these container cabins in the middle of the woods and be confident that it will not be destroyed by insects.


Quick Build Time

Normally will take only 8-10 hours to finish install one unit by 2 workers. this will also save a lot of installation time and cost.

Production

We are top manufacture in China because we are:

Pioneer in this industry to provide for oversea projects. In Year 2007 we started to export flatpack container house, there’re only several competitors in China at that time. In Year 2011 we are the first batch to use FrameCAD machine and software to start the light gauge steel house business, and was the first one in China who can provide 70mm, 89mm and 140mm light gauge steel sections;

Galvanized corner parts of the container house

We created a unique flatpack container house system: the PU injected foaming container roof is patented; all frames assembling and welding are in the special jigs to make sure the correction of the dimensions and angles; all steel sections are customized cold rolled; all steel is galvanized…

Container house production-1

We are the first one in this industry to use robot arms for welding.

smart auto welding-1

Applications


Construction site office or accommodation camp;

Mining site office or accommodation camp;

Isolation rooms;

COVID hospital;

Temporary office or living house

Low-cost house;

Granny backyard flat;

Kiosk booth;

Guard house;

Rent for other temporary use.

product appelications--Shipping Container House


Related Projects


Project NameMTI Accommodation Camp
Finished TimeYear 2022
Project PlaceIndonesia
Building Area288 rooms with ensuite in three floor, 8 buildings
Project Description

8 Staff accommodation buildings for PT. Merdeka Copper Gold. Each block in three floors, 12 rooms with ensuites in every floor, 36 rooms   combine into one block.

CBC designs, provides all materials, accessories, facilities within two months.

Project NameAMMAN Accommodation Camp
Finished TimeYear 2022
Project PlaceIndonesia
Building Area480 rooms with ensuite
Project Description

6 Staff accommodation buildings for   AMMAN. Each block in two floors, 40 rooms with ensuites in every floor, 80 rooms   combine into one block.

CBC designs, provides all materials, accessories, facilities. All pods customized for our client.


Project Showcase---container house__1


Philippines:

SCPA workshop-3200sqm with Eco Friendly Detachable Container House office inside

SG Eco workshop-3600sqm warehouse with two floors office in 250sqm,

Iriga Factory,

BBL Camp—24 rooms accommodation camp with public services such as dining hall, gym room;

Maria De Sio Resort-320sqm

SMMCI Camp—1300sqm office building built by Insulated Flat Pack Container House and 2600sqm warehouse

Project Showcase---container house__2


Project NameSMMCI Project
Finished TimeYear 2013
Project PlaceSouth Manila, Philippines
Building Area2600 S.qm warehouse plus 1700sqm office/camp facility
Project DescriptionFor "San Mining CONST. CORP.", use as onsite warehouse, office, camp and other facilities. Full package provided by   us.
Project NameCamp in Lao
Finished TimeYear 2019
Project PlaceLao
Building Area56 units
Project DescriptionAccommodation and office blocks made of flat pack container houses, most are two floors. Meets with AU standards.


FAQ


Q: What's your supply capacity?

A: Annual production capacity details are as follows:
Container house: 7200sets
Prefab house; 564000 square meters
Steel structure: 360000 square meters.


Q: How do you guarantee the quality of the products?

A: Quality is the future. Quality is the top priority.

We have a five people QC team inspecting production daily, they will follow the shop drawings strictly and check every part/project at the beginning, in the middle and for finished products.

We can also assemble some units in our factory for some special customized projects to make sure everything is good enough.


Q: How can I get a quotation for my project?

A: We can offer detailed quotations according to your drawing. If you have no drawing, our designer can offer you some designs based on your detailed requirements. Quotations will be provided after the confirmation of the designs.


Q: How do you guarantee the quality of the Eco Friendly Detachable Container House?

A: Quality is the future. Quality is the top priority.

We have a five people QC team inspecting production daily, they will follow the shop drawings strictly and check every part/project at the beginning, in the middle and for finished products.

We can also assemble some units in our factory for some special customized projects to make sure everything is good enough.


Next: No Information

You Might Also Like

(0/10)

clearall