Large Span Steel Structure
Customized H profile steel structure in large span
Heavy roof and floor loading with structure calculation
Full package including cladding, insulation, doors and windows, crane and other facilities
For steel structure warehouse, workshop, apartment building, shopping mall, office building
Product Introduction
We provide free design based on client's detailed requirements. basic information for Large Span Steel Structure project we need as below:
Size: Length*Width*Height
Win loading: For example 200km/H
Snow loading: For example 2.0Kp/S.qm
Earthquake load: For example 7 degrees
Crane (if you have):Crane span & lift height, max lift capacity, max wheel pressure and min. wheel pressure
Doors and Windows: As per detailed requirements
Floor load: For Mezzanine or multiple floor buildings
Any other requirements:If have, such as skylight, ventilator, canopy, insulation...

Advantages
1. Lower cost but beautiful outlook
2. High safety performance.
3. Easy to assemble and dismantle
4. Manufacture under complete quality control system---ISO9001
5. Installation with instruction of experienced engineers
6. Non-pollution

Applications
Steel structure warehouse building;
Steel structure workshop building;
Steel structure carpark;
Steel structure apartment building;
Steel structure shopping mall;
Steel structure airport terminal;
Steel structure aircraft hangar;
Steel structure school;
Steel structure Hotel;
Steel structure office building;
Steel structure retail store;
Steel structure logistic center;
Steel structure sports facilities;
Production
Production drawings for Large Span Steel Structure
Professional engineer team with 12 experienced engineers for large span steel structure warehouse, space structure, multiple floor steel structure buildings, heavy steel structure, Box-column structure, to achieve the best solution in Min. steel usage and meet different standards required for both structure calculations and material tests.
Production
Brand new advanced equipment such as flaming cutting, submerged arc welding, assembling machine, adjusting machine, 12 heads shot blasting machine, all kinds of cranes, folk lifts...Every working procedure has production schedule and QC, also have the right to reject any defected semi-manufactured goods from front procedure.

Related Projects
Project Name | SG workshop project |
Finished Time | Year 2017, Nov. |
Project Place | Clark, Manila |
Building Area | 3600 S.qm |
Project Description | Large Span Steel Structure with mezzanine, total building area 3600+ S.qm. From project confirmed till finished installation total 4 months |
Project Name | Tonga steel warehouse project |
Finished Time | Year 2017 |
Project Place | Tonga |
Building Area | 3500 Sqm |
Project Description | For Tonga National Power Supply Company. High standard |
Project Name | Le Tigre Warehouse |
Finished Time | Year 2017 |
Project Place | Nacala Mozambique |
Building Area | 3158 S.qm |
Project Description | In Three floors, with lift and ramp for track, heavy floor loading, wind load 275km/h, all HDG steel structure. |
Project Name | Alain's warehouse |
Finished Time | Year 2017 |
Project Place | New Caledonia |
Building Area | 1150 S.qm |
Project Description | Five floors steel structure warehouse building with elevator, heavy wind loading. |

Project Name | AES warehouse project |
Finished Time | Year 2013-2016 |
Project Place | POM, PNG |
Building Area | 2400 S.qm each |
Project Description | Same design in around 2400S.qm each, till now total 8 units |
Project Name | PNG Concrete warehouse |
Finished Time | Year 2014-2020 |
Project Place | POM, PNG |
Building Area | 2700 Sq.m |
Project Description | Six Miles development, total 8 units each around 2700S.qm, till now total building area 21000S.qm |
Project Name | SCPA workshop |
Finished Time | Year 2016 |
Project Place | Manila Philippines |
Building Area | 2600 Sq.m |
Project Description | Design and fabrication, built in heavy corrosion area |
Project Name | Virgin Islands Logistic Center |
Finished Time | Year 2015 |
Project Place | Virgin Islands |
Building Area | 11700 S.qm |
Project Description | Partial two floors steel structure building, heavy wind loading. |

Project Name | SMMCI Project |
Finished Time | Year 2013 |
Project Place | South Manila, Philippines |
Building Area | 2600 S.qm warehouse plus 1700sqm office/camp facility |
Project Description | For "San Mining CONST. CORP.", use as onsite warehouse, office, camp and other facilities. Full package provided by us. |

FAQ
Q: Are you a factory or a trading company?
A: Hangzhou Xixi Building Co., LTD. is a factory located in Xiaoshan District, Hangzhou, China.
Q: What's your supply capacity?
A: Annual production capacity details are as follows:
Container house: 72000sets
Prefab house; 564000 square meters
Portable toilet: 24000sets
Steel structure: 360000 square meters.
Q: How to install it?
A: We will provide detailed instructions along with video to you. Professional installation engineers team is available for foreign countries at your cost if it is necessary.
Q: How long is your delivery time?
A: It takes 2-30days according to different order Qty and requests.
Q: How do you guarantee the quality of the Large Span Steel Structure?
A: Quality is the future. Quality is the top priority.
We have a five people QC team inspecting production daily, they will follow the shop drawings strictly and check every part/project at the beginning, in the middle and for finished products.
We can also assemble some units in our factory for some special customized projects to make sure everything is good enough.

You Might Also Like
Send Inquiry










