Multiple Floors Steel Structure Carpark
video
Multiple Floors Steel Structure Carpark

Multiple Floors Steel Structure Carpark

Purlin:Q355B, C/Z steel section, galvanization 275g/m2
Angle brace:Q235B, L- steel
Cross bracing:Q235B round bar, L-steel
Tie bar:Q235B, round pipe

Product Introduction

Multiple Floors Steel Structure Carpark Main Structure

Column

Q355/Q235 H- steel, Box column is also available

Rafter, Beam

Q355/Q235 H- steel

Surface processing options

1. Epoxy zinc-rich primer + epoxy mica intermediate paint (120μm thickness)

2. Hot dip galvanization

Sub Structure

Purlin

Q355B, C/Z steel section, galvanization 275g/m2

Angle brace

Q235B, L- steel

Cross bracing

Q235B round bar, L-steel

Tie bar

Q235B, round pipe

Batter brace

Q235B, round bar

Roof System

Roof panel options

1. Insulated sandwich panel, PU, rock wool, glass fiber, EPS. Two sides is steel sheet. Thickness of roof panel 50mm/75mm/100mm,
thickness of steel sheet 0.4mm/0.5mm/0.6mm

2. Steel plate, thickness 0.4mm/0.5mm/mm

Gutter options

Gutter options

1. Galvanized steel gutter, thickness 2.0mm/2.5mm, 3.0mm

2. Painted, Pre-finished steel gutter, thickness 0.4mm/0.5mm/0.6mm

Down spout

PVC pipe

Steel flashing and cover

Steel sheet for roof ridge cap, gable wall end cover and corner cover

Options

Roof skylight 1.8mm PVC sheet and stainless-steel ventilator


Hot Dip Galvanized Steel Structure Warehouse-5


Advantages


Recyclability

When a steel-framed building is demolished, its components can be reused or circulated into the steel industry's closed-loop recycling system for meltdown and repurposing. Steel can be recycled endlessly without loss of properties. Steel saves the usage of natural raw resources around 30%.

More Space, Less Material

Steel’s ability to maximize space and internal width with the thinnest shell possible. Steel beam depths are around half of timber beams, offering greater usable space, fewer materials, and lower costs. This can be particularly relevant for heavily constrained sites, where steel’s space-saving properties can be the key to overcoming spatial challenges.


Cost-saving

It is inexpensive to manufacture and erection, it requires less maintenance than other traditional building methods. Steel frames won’t rot, splinter or become damaged by pests, and insurance companies typically charge substantially less on homeowner’s insurance for steel frames over timber frames.

Faster Assembly

It comes pre-engineered, which means that your employees will spend less time measuring, cutting and shaping. with a corresponding 20% to 40% reduction in construction time. This prefab steel building makes construction easier, faster, and provides cost savings on labor.


Steel structure workshop

Applications


Steel structure warehouse building;

Steel structure workshop building;

Steel structure carpark;

Steel structure apartment building;

Steel structure shopping mall;

Steel structure airport terminal;

Steel structure aircraft hangar;

Steel structure school;

Steel structure Hotel;

Steel structure office building;

Steel structure retail store;

Steel structure logistic center;

Steel structure sports facilities;


Related Projects


Philippines:

SCPA workshop-3200sqm with Two Floor Flat Pack Container Homes inside

SG Eco workshop-3600sqm warehouse with two floors office in 250sqm,

Iriga Factory,

BBL Camp—24 rooms accommodation camp with public services such as dining hall, gym room;

Maria De Sio Resort-320sqm

SMMCI Camp—1300sqm office building built by flatpack container house and 2600sqm warehouse


Large Span Prefabricated Steel Structure Warehouse-2


PNG:

PNG concrete Development—13 steel structure warehouse in around 1500sqm each;


Virgin Island: 10000sqm Distribution center


New Caledonia:

Alain's warehouse-five floors warehouse building with cargo lift, in total 1750sqm

Le Tigre Warehouse—three floors warehouse with ramp, total 3700sqm


Mozambique:

Nakala Resort—32 units of light gauge steel house as a beach side resort;


Tonga: Tonga Power Plant—3600sqm


Reunion Island: ARC-18/19 House Project—240sqm


2


Project Name

SMMCI Project

Finished Time

Year 2013

Project Place

South Manila, Philippines

Building Area

2600 S.qm warehouse plus 1700sqm office/camp facility

Project Description

For "San Mining CONST. CORP.", use as onsite warehouse, office, camp and other facilities. Full package provided by us.


FAQ


Q. Who are you?

A. CBC is a top provider for customized building solutions based in Hangzhou city China.


Q: What about the installation of Modern Design Steel Structure Hotel?

A: We'll provide the detailed installation drawing, supervisor guiding installation is also available. We can do turn-key job for some kind of projects.


Q: How can you guarantee the project can be approved by local authority?

A: 1) All customized designs based on your detailed requirements;

2) All materials can meet with local standards;

3) Structure calculations provided free to help to get approval;

4) More than 10 Years’ oversea project experiences prepared us well for any questions.


Q: What’s the process to start the cooperation?

A: To let us know your requirements or to send the designs of Portable Detachable Container House;

Confirm our customized design for you based on above requirements;

Confirm the quotation based on our customized designs;

Arrange the down payment;

Confirm the shop drawings and make clear how we can fulfill your requirement;

Pass the inspection after around 30 days of production;

Arrange the balance payment;

Receive and study the installation instructions;

Receive the materials;

Finish the installation following our instructions and on-line engineering support;

Use our BIM system for a lifetime after sales maintenance service;

Appricate your recommendation or re-order;


Anti Rusty Steel Structure Workshop-Steel structure processing flow